Shall, Should, May, Can: The Four Levels of Clause Wording That Decide What Is Required

Key takeaways

The verb in a clause decides its force: shall is a requirement, should a recommendation, may a permission, can a capability statement. Read the verb before you read the condition table. Three misreadings recur: treating should as a free pass, treating every annex as background reading, and treating where applicable as optional. Across national standards, OEM standards, technical agreements and the test plan, wording tightens rather than loosens, and any trade-off must be written down. The basis column in a test plan should carry the standard, the clause and the level of wording, not just the standard number.

A clause that says shall and a clause that says should differ by one failed report. Shall is a requirement: skip it and the item is nonconforming. Should is a recommendation: skip it and you owe a stated reason. May is permission: either choice complies. Can describes capability and never enters a verdict. Collapse these four levels into one tone, and a test plan will quietly turn required items into optional ones. By the time the report comes back from the customer, the problem is no longer on the laboratory side.

Commission forms often say only "tested to GB/T 28046". That single sentence already collapses four levels into one.

1. What each of the four levels does

WordingWhat it asks of youWhat happens if you skip it
---------
shall / shall notMust be done, with matching conditions and verdicts in the reportIt is a nonconformity; the conclusion cannot read compliant
should / should notRecommended practice; departures need a reason on recordNot a nonconformity, but an auditor will ask why it was not done
may / need notPermitted options, chosen by sample state and test purposeEither choice complies, but state which one you took
can / cannotDescribes capability and possibility, creating no obligationIrrelevant to the pass or fail decision

These levels are not a declaration parked in the foreword; they are distributed clause by clause. Requirements appear in the main clauses, method detail often appears as should, and interchangeable means appear as may. So when you open a standard, read the verb in the sentence before you read the condition table.

The payoff is immediate: the table tells you how much, the verb tells you whether. Read them in the other order and no amount of detail will help.

2. Three misreadings that recur

First, treating should as a free pass. A recommendation creates no nonconformity, but it is still the document's position on the matter. The exposure is not at the national standard level; it is above it. OEM standards routinely promote a should to a shall, and technical agreements add their own requirements. The deciding question is not what level the standard's text uses, but which of these documents governs this project. This trips people precisely where OEM standards run tighter than the national baseline, and the relationship between OEM and national standards covers that in more detail.

Second, treating every annex as background reading. An annex is not automatically informative. A normative annex ranks with the body of the text, and any shall inside it is a requirement; an informative annex supplies information and method examples only. Both types sit after the main text, so the only reliable signal is the qualifier in the annex title. The mirror-image error is equally common: arguing that "the standard requires this" on the strength of an example condition printed in an informative annex, when the standard requires nothing of the kind.

Third, treating conditional clauses as optional. Phrases such as where applicable, unless otherwise specified, and as specified by the manufacturer do not excuse the item; they hand the decision outward. If the condition holds, the item must be done. If it does not hold, the reason has to be on file. These are the clauses most often left blank in a plan, and a blank does not mean one fewer test item; it means an explanation improvised during execution.

3. How one sentence shifts across four documents

DocumentHow the wording usually movesWhere responsibility lands
---------
National standardSets the baseline: a set of shall clauses plus several should clauses, with some parameters left to the userThe standard supplies conditions and criteria, not the trade-offs for your project
Industry or OEM standardOften promotes a national should to a shall and adds its own clauses and finer verdictsCompliance is judged against the OEM standard, and the OEM interprets it
Technical agreementMakes project-level trade-offs on top of the OEM standard; deletions and tightening both need written confirmationWhoever signs owns it, and the report must trace back to that clause
Test planTurns all of the above into an item-by-item executable table with source and level notedThe plan is the basis for execution; a missing column becomes improvisation

The direction is essentially one way. From national standard to OEM standard, clauses tighten rather than loosen. From OEM standard to technical agreement, project-level trade-offs are allowed, but they have to exist on paper.

Take the class selection in CISPR 25: leaving the choice of class to the user is not the standard going soft, it is a question that belongs to the user and the technical agreement in the first place. By contrast, the applied conditions written with shall in GB/T 28046 or ISO 16750 leave no room for "not applicable this time"; the only question is whether the condition holds. The two cases are handled differently, and the verb is what tells them apart.

The EMC testing page lists the items that can be commissioned, but that list will not choose a class for you; the class is the user's decision, and the level of wording behind it has to be read in the document and the agreement.

4. Four columns the plan should carry

  • Level of wording: mark each item shall, should or may, so the binding ones are visible at a glance.
  • Source and version: standard number, clause and edition year together. The same clause can move from should to shall between editions, and a bare standard number points at the wrong force.
  • Reason for deletion or deviation: one line per skipped item, saying why it does not suit this sample or this mounting location.
  • Matching verdict: every requirement needs a verdict; a recommendation that was not performed still needs a note in the report rather than a blank.

Fill these four and the plan changes character. It stops being a list of conditions and becomes a record of why the conditions were set that way. The four columns look the same whether the commission is reliability testing or EMC; only the document the clauses come from changes. The difference shows at the review table: being able to turn to that line, versus being asked three times before anyone remembers, are two different situations. Drawing the verdict boundary itself is a further layer, covered in reading limits at the boundary, and sample quantity is affected by the same level question, since destructive requirements and recommendations cannot follow one rule, as set out in how many samples to submit.

When TMC LAB takes on a commission, the level of each clause and the reason for any deletion go into the test plan before the chamber is loaded. Doing it up front saves a round of correspondence when the report reaches an auditor.

5. A few honest words

A standard does not loosen because it is hard to read; it becomes clear once you can read it.

Should is not a free pass, and may is not a to-do list. Two questions decide what gets done: which level the clause sits at, and which document governs you.

Deciding what to keep when trimming a list for a mounting location is a separate exercise; the environmental reliability checklist covers the trimming basis. Once trimmed, each surviving item still needs its level marked, and that is the layer this article adds.

The valuable column in a test plan is not the condition, it is the basis.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

If a clause says should, can we simply skip it?
A recommendation does not create a nonconformity, but it is not a silent free pass either. The reason for skipping belongs in the test plan or the commission form, explaining why it does not apply to this sample or this mounting location. The real exposure is that the document governing your project may not be that national standard at all: OEM standards routinely promote a should to a shall, and a technical agreement may add its own requirements. So the deciding question is not what the standard's wording says, but which of these documents governs this project and what level it uses.
Do the conditions in an informative annex have to be followed?
An informative annex provides information and method examples and creates no requirement, whereas a normative annex ranks with the body of the text and any shall inside it is a requirement. The two get confused because layout places both after the main text. Look at the qualifier in the annex title, not at its position. One practical layer remains: conditions shown as examples in an informative annex are often cited as requirements in an OEM standard, and in that case they bind through the OEM standard, not through the annex.
How should shall, should, may and can be read in an English standard?
They map one to one onto the four Chinese levels. Shall is a requirement, and failing it is a nonconformity. Should is a recommendation, and departing from it needs a reason. May is permission, so either choice complies. Can describes possibility and capability and creates no obligation. Note also that need not is the negative of permission, not a prohibition; shall not is the prohibition. Reading should as a soft suggestion or may as fully optional is defensible in prose, but in a test plan all four must be written into one classification, or the two language versions will not line up.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826
Call