Key takeaways
The severity level specifies an RF current to be established on the harness, and that current is produced by five links acting together: source and modulation, power amplifier, directional coupler and power meter, injection probe, monitor probe. The calibration fixture exists to pin wire diameter, position and termination into a reproducible geometry so the power-to-current curve can be carried over. The substitution method assumes the current does not change once the DUT is connected; the closed-loop method assumes the point you read is the point being stressed. Both fail in the same way - a assumption treated as a condition. Three questions audit any test plan: which fixture, substitution or closed loop, and where the monitor probe sits.
There is no injection-current setting on a BCI bench. What you can set is source level and amplifier gain. The current is a result at the far end of a chain: converted through the injection probe's transfer relation, then corrected by what the monitor probe reads back. A claim that a sample was "tested at a given current" only holds when all five links are pinned down. If any one drifts, the report still reads well while the stress the DUT actually took has already changed.
None of this shows up in the report, because the report lists a target value and a measured value, not how either was produced.
1. What the chain looks like: five links, one job each
From source to DUT, five links sit in series. Each of them changes how much current ends up clamped onto the harness, and each fails in its own way.
| Link | What it governs | How failure shows up |
|---|---|---|
| --- | --- | --- |
| Source and modulation | Provides carrier and modulation envelope; depth comes from the standard version and the agreement | Distorted envelope or insufficient depth, immunity becomes laxer while readings look normal |
| Power amplifier | Raises level enough to drive the probe, with flatness across the sweep | Compression and clipping; forward power stops rising, harmonics increase |
| Directional coupler and power meter | Reads forward power as the evidence of what went in | Poor directivity counts reflected power as incident, reading runs high |
| Injection probe | Converts power into common-mode current clamped on the bundle | Saturation, off-centre mounting, diameter mismatch; transfer relation drifts with frequency |
| Monitor probe (closed loop) | Reads actual current and drives the feedback | Wrong position or orientation, secondary loading; the loop locks onto the wrong point |
Read the table with one sentence in mind: the first four links decide how much you applied, the last one decides how much you believe you applied. They are not the same quantity, and the report only carries the second.
2. A probe is not a fixed transformer
The common assumption is that an injection probe is a constant device: feed in a known power, get out a known current. That is not how it behaves.
For one probe at one frequency, the current it can establish depends on three things: wire diameter, the probe's position relative to the wire, and termination impedance. Change any of them and the transfer relation changes. This is why a calibration fixture is required in the first place - its purpose is not ceremonial. It pins diameter, position and termination into a reproducible geometry so that a power-to-current curve has somewhere to live.
Carrying that curve over requires matching conditions. If the calibration wire diameter differs from the real harness, if the probe sits at a different position, if termination changed from a short to a load simulator, the curve is a reference, not a condition.
Two practices cause trouble on real benches:
- Using the probe supplier's typical curve as if it were this bench's curve. A typical curve is an average over some geometry, not a measurement of yours.
- Calibrating once and never again. Probes age, connectors loosen, amplifier flatness shifts, and the curve moves with them.
3. Substitution and closed loop: two ways of knowing what went in
One severity level can be realised in two ways. The difference is which quantity you trust.
| Method | How stress is fixed | Where it breaks |
|---|---|---|
| --- | --- | --- |
| Substitution | Forward power that produced the target current under calibration, applied unchanged once the DUT is connected | Impedance changes when DUT and load simulation are connected, so the same power may no longer give that current |
| Closed loop | Current read continuously, forward power adjusted to hold the target | Probe position decides which point is held, and the monitor probe itself loads the circuit |
These two routes are often read as a low grade and a high grade. They are two assumptions, not two grades.
Substitution assumes the current does not change with what is connected. That holds reasonably well on a long bundle with stable termination impedance, and weakens when DUT input impedance swings with operating mode - which is the normal case in a vehicle.
Closed loop assumes the point you read is the point being stressed. That is close to true when the monitor probe sits next to the injection probe; once the two are separated, standing waves appear along the harness and the current at the terminals can differ substantially from the reading.
This is why a report saying "closed loop, monitor probe at position X" carries more information than one saying "closed loop".
4. What the error looks like in the report
In the six cases below, bench readings are usually normal. What shifts is the actual stress.
| Situation | What the bench shows | Which way the stress goes |
|---|---|---|
| --- | --- | --- |
| Amplifier in compression | Forward power flattens at the high end | Actual current below target, test laxer |
| Coupler with poor directivity | Forward reading steady but high | Actual current below reading, error varies with mismatch |
| Probe off-centre on the bundle | Resonance points shift as a group | Some frequencies over-stressed, others under-stressed |
| Monitor probe far from injection point | Loop stable, holds well | Current at terminals lower than the reading |
| Several wires in one bundle | Single-point reading meets target | After splitting, no single wire reaches target |
| Probe heating during a long sweep | Reading drifts between start and end | First half and second half are not the same test |
The first two make the test laxer, the middle two make it tighter, the last two make one report internally incomparable. Only the lax direction hurts at the customer end - the part passes, fails in the vehicle, and the report shows nothing wrong.
5. Columns to pin down in the plan
Blank rows in a template are worse than wrong ones, because nobody asks about a blank.
| Plan field | Why it must be written | Cost of omitting it |
|---|---|---|
| --- | --- | --- |
| Probe model, calibration date, fixture ID | The curve is bound to geometry | Curve provenance unknown, readings untraceable |
| Harness length, routing, termination, load simulation | Impedance sets current distribution | Swapping a harness swaps the stress |
| Substitution or closed loop; monitor probe position | The two assumptions cannot be mixed | Customer reads closed loop, lab performs substitution |
| Target current and frequency range | Points to applicable standard version and agreement | Old severity table applied to a new requirement |
| Criterion and monitoring means | Immunity verdict must land on a functional status class | "No abnormality" recorded, deviation unjudgeable |
| Amplifier rating, coupler directivity, power meter calibration | Margin of the first four links lives here | Insufficient amplifier is pushed into compression |
One point is routinely missed: amplifier rating must carry margin at the least favourable frequency, not at the mid-band where it looks comfortable. Probe transfer efficiency is usually poorer at the high end, so more forward power is needed exactly where amplifier output is falling. Squeezed from both sides, compression starts at the top of the sweep - which is where most DUTs begin to respond.
6. A few honest words
Ask a lab "do you test to the standard" and you get an attitude. Ask these three and you get conditions:
First, which fixture was used for calibration, and can its ID appear in the report. Second, substitution or closed loop, and why that choice. Third, for a closed loop, on which segment of the bundle the monitor probe sits and how far it is from the injection point.
Answer those three and the current value becomes a reproducible condition. Fail to answer them and it stays an intention.
TMC LAB writes these five links and the calibration conditions into the plan page when a BCI job is booked, so the client can check them before the bench is switched on rather than guessing from readings afterwards. The time that takes is usually far less than one round of rework.
If the injection question itself is still open - why BCI and radiated immunity cannot substitute for each other, or how bundle effects change the result - the companion pieces on BCI versus radiated immunity and field calibration in the ALSE method cover those layers. The clause structure sits on the ISO 11452 series page, and the service-side item list is under EMC testing.
Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.