Key takeaways

The severity level specifies an RF current to be established on the harness, and that current is produced by five links acting together: source and modulation, power amplifier, directional coupler and power meter, injection probe, monitor probe. The calibration fixture exists to pin wire diameter, position and termination into a reproducible geometry so the power-to-current curve can be carried over. The substitution method assumes the current does not change once the DUT is connected; the closed-loop method assumes the point you read is the point being stressed. Both fail in the same way - a assumption treated as a condition. Three questions audit any test plan: which fixture, substitution or closed loop, and where the monitor probe sits.

There is no injection-current setting on a BCI bench. What you can set is source level and amplifier gain. The current is a result at the far end of a chain: converted through the injection probe's transfer relation, then corrected by what the monitor probe reads back. A claim that a sample was "tested at a given current" only holds when all five links are pinned down. If any one drifts, the report still reads well while the stress the DUT actually took has already changed.

None of this shows up in the report, because the report lists a target value and a measured value, not how either was produced.

1. What the chain looks like: five links, one job each

From source to DUT, five links sit in series. Each of them changes how much current ends up clamped onto the harness, and each fails in its own way.

LinkWhat it governsHow failure shows up
---------
Source and modulationProvides carrier and modulation envelope; depth comes from the standard version and the agreementDistorted envelope or insufficient depth, immunity becomes laxer while readings look normal
Power amplifierRaises level enough to drive the probe, with flatness across the sweepCompression and clipping; forward power stops rising, harmonics increase
Directional coupler and power meterReads forward power as the evidence of what went inPoor directivity counts reflected power as incident, reading runs high
Injection probeConverts power into common-mode current clamped on the bundleSaturation, off-centre mounting, diameter mismatch; transfer relation drifts with frequency
Monitor probe (closed loop)Reads actual current and drives the feedbackWrong position or orientation, secondary loading; the loop locks onto the wrong point

Read the table with one sentence in mind: the first four links decide how much you applied, the last one decides how much you believe you applied. They are not the same quantity, and the report only carries the second.

2. A probe is not a fixed transformer

The common assumption is that an injection probe is a constant device: feed in a known power, get out a known current. That is not how it behaves.

For one probe at one frequency, the current it can establish depends on three things: wire diameter, the probe's position relative to the wire, and termination impedance. Change any of them and the transfer relation changes. This is why a calibration fixture is required in the first place - its purpose is not ceremonial. It pins diameter, position and termination into a reproducible geometry so that a power-to-current curve has somewhere to live.

Carrying that curve over requires matching conditions. If the calibration wire diameter differs from the real harness, if the probe sits at a different position, if termination changed from a short to a load simulator, the curve is a reference, not a condition.

Two practices cause trouble on real benches:

  • Using the probe supplier's typical curve as if it were this bench's curve. A typical curve is an average over some geometry, not a measurement of yours.
  • Calibrating once and never again. Probes age, connectors loosen, amplifier flatness shifts, and the curve moves with them.

3. Substitution and closed loop: two ways of knowing what went in

One severity level can be realised in two ways. The difference is which quantity you trust.

MethodHow stress is fixedWhere it breaks
---------
SubstitutionForward power that produced the target current under calibration, applied unchanged once the DUT is connectedImpedance changes when DUT and load simulation are connected, so the same power may no longer give that current
Closed loopCurrent read continuously, forward power adjusted to hold the targetProbe position decides which point is held, and the monitor probe itself loads the circuit

These two routes are often read as a low grade and a high grade. They are two assumptions, not two grades.

Substitution assumes the current does not change with what is connected. That holds reasonably well on a long bundle with stable termination impedance, and weakens when DUT input impedance swings with operating mode - which is the normal case in a vehicle.

Closed loop assumes the point you read is the point being stressed. That is close to true when the monitor probe sits next to the injection probe; once the two are separated, standing waves appear along the harness and the current at the terminals can differ substantially from the reading.

This is why a report saying "closed loop, monitor probe at position X" carries more information than one saying "closed loop".

4. What the error looks like in the report

In the six cases below, bench readings are usually normal. What shifts is the actual stress.

SituationWhat the bench showsWhich way the stress goes
---------
Amplifier in compressionForward power flattens at the high endActual current below target, test laxer
Coupler with poor directivityForward reading steady but highActual current below reading, error varies with mismatch
Probe off-centre on the bundleResonance points shift as a groupSome frequencies over-stressed, others under-stressed
Monitor probe far from injection pointLoop stable, holds wellCurrent at terminals lower than the reading
Several wires in one bundleSingle-point reading meets targetAfter splitting, no single wire reaches target
Probe heating during a long sweepReading drifts between start and endFirst half and second half are not the same test

The first two make the test laxer, the middle two make it tighter, the last two make one report internally incomparable. Only the lax direction hurts at the customer end - the part passes, fails in the vehicle, and the report shows nothing wrong.

5. Columns to pin down in the plan

Blank rows in a template are worse than wrong ones, because nobody asks about a blank.

Plan fieldWhy it must be writtenCost of omitting it
---------
Probe model, calibration date, fixture IDThe curve is bound to geometryCurve provenance unknown, readings untraceable
Harness length, routing, termination, load simulationImpedance sets current distributionSwapping a harness swaps the stress
Substitution or closed loop; monitor probe positionThe two assumptions cannot be mixedCustomer reads closed loop, lab performs substitution
Target current and frequency rangePoints to applicable standard version and agreementOld severity table applied to a new requirement
Criterion and monitoring meansImmunity verdict must land on a functional status class"No abnormality" recorded, deviation unjudgeable
Amplifier rating, coupler directivity, power meter calibrationMargin of the first four links lives hereInsufficient amplifier is pushed into compression

One point is routinely missed: amplifier rating must carry margin at the least favourable frequency, not at the mid-band where it looks comfortable. Probe transfer efficiency is usually poorer at the high end, so more forward power is needed exactly where amplifier output is falling. Squeezed from both sides, compression starts at the top of the sweep - which is where most DUTs begin to respond.

6. A few honest words

Ask a lab "do you test to the standard" and you get an attitude. Ask these three and you get conditions:

First, which fixture was used for calibration, and can its ID appear in the report. Second, substitution or closed loop, and why that choice. Third, for a closed loop, on which segment of the bundle the monitor probe sits and how far it is from the injection point.

Answer those three and the current value becomes a reproducible condition. Fail to answer them and it stays an intention.

TMC LAB writes these five links and the calibration conditions into the plan page when a BCI job is booked, so the client can check them before the bench is switched on rather than guessing from readings afterwards. The time that takes is usually far less than one round of rework.

If the injection question itself is still open - why BCI and radiated immunity cannot substitute for each other, or how bundle effects change the result - the companion pieces on BCI versus radiated immunity and field calibration in the ALSE method cover those layers. The clause structure sits on the ISO 11452 series page, and the service-side item list is under EMC testing.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

The severity level is given as an injection current - can I just set the amplifier output to match?
No, because two conversions sit between amplifier output and harness current. One is the insertion loss of the coupler and cables; the other is the injection probe's transfer relation at that frequency, wire diameter and position. Both vary with frequency and with fixture and harness geometry, so no fixed power-equals-current factor exists. The correct route is to measure that curve on the calibration fixture first, derive power from it for the actual setup, and where a closed loop is used, correct with the monitor probe reading.
Will the report state whether substitution or closed loop was used? The customer gave only one current value.
It should, because the two methods produce different stress distributions. Substitution applies the forward power that produced the target current under calibration conditions and then stops watching current once the DUT is connected; closed loop keeps reading current and adjusting during the test. When a plan gives a single current value, ask how it is realised: for a closed loop over the full harness, which segment the monitor probe sits on and in which orientation; for substitution, whether wire diameter and termination match between calibration and test. Without those, the number is an intention rather than a condition.
If the harness or the DUT changes, does the injection probe need recalibration?
The curve is a property of the probe and the fixture, not of the DUT, so it does not need remeasuring every time. Its applicability, however, depends on whether test conditions match calibration conditions. Change the wire diameter, the probe-to-harness position, the termination or the load simulation, and the curve can no longer be carried over. The workable practice is to record calibration conditions in checkable fields - fixture ID, wire diameter, termination - and compare them column by column before the test. Any mismatch calls for a fresh calibration or a closed loop, and that cost is far lower than explaining a reading difference afterwards.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.