Key takeaways
A quiescent current result rests on three decisions - when the module counts as asleep (sleep criteria plus settling time), how long you watch it (the window must cover a full wake cycle), and whether the measurement chain itself keeps waking it (meter burden voltage and range resolution). Miss any one and the reading still looks clean while being neither repeatable nor transferable to vehicle stand-by. Limits come from the customer specification and the vehicle dark-current budget; the standards define method and conditions.
A quiescent current report carries a single number. Whether that number means anything depends on the state it was read in. Sleep criteria, observation window and measurement chain are three separate decisions - skip any one and the reading still looks clean while the vehicle goes flat after a few days parked.
The difficulty is that none of the three appears on the result page. They live in the conditions column, and that column is often a single line.
1. Three names, three levels
Dark current, quiescent current and sleep current get used interchangeably in enquiries. They are not synonyms; they describe the same behaviour at three levels.
| Name | Measured at | Limit comes from | What goes wrong when mixed up |
|---|---|---|---|
| --- | --- | --- | --- |
| Dark current (vehicle) | Battery negative or the permanent-supply trunk, including all stand-by loads | Budget derived from the vehicle stand-by target | Comparing a component figure with a vehicle figure, ignoring add-on equipment and parasitic paths |
| Quiescent current (component) | Permanent-supply input of the sample | Value allocated to that part by the customer specification or technical agreement | Treating a component pass as a vehicle pass, missing a network that never goes silent |
| Sleep current (network) | Sum of nodes after the bus goes silent | Network management rules and the vehicle budget | Looking at one node only, ignoring a node that keeps the bus active |
The point of the layering: a component pass only means the part stayed inside its own boundary and inside the share allocated to it. It says nothing about vehicle stand-by.
The electrical-load sections of ISO 16750 and GB/T 28046 both include a quiescent current item. They define method, conditions and the point of judgement, not a universal value; clause positions and exact conditions follow the current edition. Numbers come only from the customer specification, the technical agreement and the vehicle budget. For how this family of conditions is organised, see the ISO 16750-2 electrical load breakdown and how electrical load conditions differ.
2. Being asleep has a criterion: four signs it is not
A module that has not slept is rarely dramatic; it is simply not quiet. A sleeping sample is a flat line. A sample that cannot sleep shows one of four shapes.
| Wake source | Shape on the curve | Why it gets read as "current too high" |
|---|---|---|
| --- | --- | --- |
| Bus activity continues | Regular steps, or trains of pulses | Only an instantaneous value is taken, landing inside an activity window |
| Wake line held wrong | Stays high, current never reaches the plateau | Pick-up point placed on the wake line instead of the permanent supply |
| Periodic tasks | Evenly spaced small peaks on a flat line | Averaging erases the peaks, or peak reading calls a normal heartbeat a failure |
| External path | Slow rise, or varies with humidity | Attributed to the electronics when it is condensation or add-on equipment |
The first two are "never slept". The last two are "slept but keeps waking". The corrective actions are entirely different: the first pair points at sleep conditions and network management, the second at the energy budget of periodic tasks.
One note on the bus. A network can only go silent if the interface holds the correct differential state with no frames present - a transceiver or termination problem keeps the bus active and the node cannot sleep. That belongs to the interface electrical contract, covered in CAN physical layer conformance. The other easily missed path is undervoltage reset: when the supply sits near a threshold during a slow ramp, the control unit resets repeatedly and every reset is a wake-up, producing a stepped curve. Reset behaviour during voltage ramps explains why that judgement needs both ramp directions.
3. The measurement chain changes the result
This item differs from other electrical tests. Elsewhere you apply stress to the sample; here you watch the sample do nothing, so the measurement chain itself becomes visible.
| Method | What it shows | What it changes |
|---|---|---|
| --- | --- | --- |
| Multimeter in series (mA range) | One steady value, fine for a rough check | Meter and fuse resistance create a voltage drop; the sample may reset repeatedly or never sleep |
| Shunt with a logger | Continuous curve, steps and periodic peaks | Needs four-wire connection; watch thermal drift and range switching, and the joints add resistance |
| Current clamp | No break in the circuit, can stay on for hours | Resolution and zero drift in the low-current range must be verified separately |
All three produce a number. The difference is whether that number acts back on the object being measured. The series meter brings burden voltage, the clamp brings resolution, the shunt has to handle both.
There is also a sampling issue. Periodic wake-up peaks are narrow; if the logger sample rate is too low they disappear entirely and you see a flat line and call it clean. Sample rate belongs in the conditions next to the judgement basis, otherwise the flat line may simply be an unrecorded one.
4. Two times: how long to wait, how long to watch
How long to wait is settling. Between removing the wake source and the current reaching its plateau there is a transition. Readings taken inside it are high and inconsistent. The basis for declaring the module asleep must be written into the plan: either bus silence plus a fixed wait, or the current staying within a stated band for a stated duration. The second is more verifiable, but the band and the duration come from the agreement, not from the laboratory.
How long to watch is the observation window, and it must cover a full wake cycle. Watch too briefly and you may catch the quiet gap between two heartbeats, or catch one heartbeat.
That raises the question of averaging versus peak.
- Vehicle stand-by duration is read from the average;
- Battery protection and fuse selection are read from the peak.
The two are not interchangeable and cannot explain each other. Whichever one the report states, the criterion must use the same one. This mirrors initial measurement, recovery time and pick-up point comparability: "stable" means different things in different projects, and only a checkable condition settles it.
5. Five fields in the plan
| Field | What to state | If left blank |
|---|---|---|
| --- | --- | --- |
| Pick-up point and ground | Which segment of the permanent supply, whether fuses and harness are included, where the ground reference sits | Two people measuring the same part differ by an order of magnitude |
| Sample state | Component, with load simulation, or vehicle; whether all network nodes are present | No sleep criterion is possible, the reading has no reference |
| Sleep criterion and settling | What declares it asleep, and how long was waited | The transition is treated as steady state: high and not repeatable |
| Window and sampling | How many full cycles are covered, recording method and sample rate | Average or peak basis is unclear, the criterion cannot be applied |
| Limit source and basis | Which specification or agreement the allocated value comes from, average or peak | The pass line cannot be explained at audit and the report stays advisory |
Temperature and supply voltage belong in the conditions rather than in the defaults: leakage varies with temperature, and supply level changes a regulator's own quiescent current. A low-temperature repeat often carries more information than tightening the room-temperature case, because available battery capacity falls at the same time.
When TMC LAB takes on this type of work, the pick-up point, sleep criterion and settling time go into the plan first, and the logger is connected only after that is agreed - so nobody discovers afterwards that the transition segment was recorded.
6. A few honest notes
The diagnostic order matters: total current first, then segments (pull fuses, compare branches), and only then a specific control unit. Before replacing a part, prove that the old one genuinely failed to sleep under the same conditions; otherwise the new part will repeat the same result.
Three situations do not belong to the electronics and should not be hunted on the board: add-on equipment drawing power continuously, conductive paths formed by condensation, and parasitic loads from damaged harness or a stuck relay. In segment measurement all three look like "normal as soon as this branch is disconnected" - and that branch is usually not the control unit itself.
For standard conditions and judgement items, start with ISO 16750, GB/T 28046 and the reliability testing pages, then check the allocated values against the customer specification.
Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.



