Skip to main content
  1. Home
  2. Technical Blog
  3. Environmental Reliability
  4. An IP67 Part Still Fogs Up - Pressure Difference, Venting Membranes and Cavity Breathing, the Sealing Path Everyone Misses

An IP67 Part Still Fogs Up - Pressure Difference, Venting Membranes and Cavity Breathing, the Sealing Path Everyone Misses

Key takeaways

A seal has to stop three things - liquid water, water vapour and pressure difference. A protection-level test only examines the first, so passing IP does not mean the part stays dry over time. Under constant volume the pressure difference scales roughly with the temperature difference, and its direction reverses between heating and cooling, so the seal interface is pushed and pulled repeatedly; that is breathing, and without a vent path the cycle carries outside moisture in. Four fields belong in the test plan - whether the cavity has a vent and which way it faces, the temperature limits and transition mode of the cycle, whether humidity is applied at the same time, and at which temperature point fogging is judged and whether a dry-out re-check follows. Miss one and the results cannot be compared.

IP67 only says a sample does not admit water during a defined short immersion; it does not say the air inside the housing is isolated from the outside. Change the temperature and the internal pressure changes with it. That pressure difference has to go somewhere: blocked, it pushes on the seal; allowed to move, it carries outside moisture in a little at a time across repeated heating and cooling. Most cases of "it passed IP and still takes on water, still fogs up" start here, not with seal hardness or a potting compound.

This is not an argument against the protection-level test. It measures a different quantity - one that is easily mistaken for the whole story.

1. A seal stops three things; the protection test examines one

What must be stoppedWhat tests itWhat it is mistaken for
---------
Liquid water (immersion, jetting)Protection-level tests per the enclosure standardImmersion passed, therefore no water over time
Water vapourDamp heat and temperature cycles that carry humidityOnly the protection test is run, no humid cycle
Pressure differenceTemperature cycling, transport and altitude conditionsThe field is absent from the plan altogether

Each one fails in a different place. Liquid water takes ports, gaps and interfaces. Vapour moves by diffusion and permeation. Pressure difference acts on the structure and on the micro-opening of the seal interface.

In one line: the protection test asks whether water can get in, not whether air is exchanged.

2. Where the pressure difference comes from

At constant volume, the pressure difference scales roughly with the temperature difference. What sets its magnitude is not how hot the part gets but how many degrees it moved this time.

Moving from the cold end to the hot end, or opening a climatic chamber to unload parts, both produce a real difference. More importantly, the direction reverses: heating pushes outward, cooling pulls inward.

A few cycles a day and the seal interface is pushed and pulled again and again. That is breathing.

Three consequences, in order of how often they show up:

  • The seal is pushed to one side of its groove and cannot recover fast enough, leaving a channel
  • Clips and mating faces take repeated load, and the micro-gap becomes the actual path
  • Lenses, thin walls and membranes deflect repeatedly, shearing the adhesive layer at the interface

The real task of a seal is therefore not to close the cavity. It has to allow slow equalisation while refusing to carry water in during that equalisation. Those two requirements pull the structure in opposite directions.

3. What a venting membrane actually solves

ArrangementHow the pressure difference movesWhat it costs
---------
Sealed with no pathOnly through micro-gaps at the seal interfaceBreathing carries vapour in; structure loaded under large differences
Port with a venting membraneGas passes slowly through the membrane, liquid held back by the hydrophobic poresThe membrane becomes a failure location of its own
Open port without a membraneAir moves freely, difference equalised at onceLiquid water and dust enter directly

Membrane selection comes down to two figures: air flow (volume through the membrane per unit time) and water entry pressure (the pressure needed to push water through). Both come from the supplier datasheet and the customer technical agreement; no standard sets them for you.

Membrane failures cluster in four places, none of them in the membrane material itself:

  • Fitted at the highest point of the cavity, where condensate and cleaning fluid collect
  • The port clogged by mud, wax, paint or a label, putting the difference back onto the seal interface
  • Fitted the wrong way round, hydrophobic face inward, so liquid water passes straight through
  • Position and area chosen by appearance rather than by the air path

The last two are assembly and design issues, and neither shows up on a report. That is why fogging complaints keep returning: every test passes, and the problem appears months after the part is on the vehicle.

4. Passing IP and still taking on water

Test typeWhat is appliedWhat it proves
---------
ImmersionOne immersion at a defined depth and durationLiquid water did not enter at that moment
High-pressure jettingHot high-pressure water sprayThe seal is not breached under washing
Temperature cycling with humidityRepeated pressure difference plus vapour partial-pressure differenceAccumulated breathing and permeation over time
Transport and altitude pressure changeRapid difference and low-pressure dwellStructural deflection and seal extrusion

The first two rows are a single event; the last two are an account settled over thousands of cycles. Pass the first two, skip the last two, and the conclusion covers only the moment of despatch.

What the K suffix in a jetting class actually governs is covered in our note on IP6K9K versus IP69K and is not repeated here. One point is enough: however severe the jetting condition, it is still applied once.

5. Split reversible from irreversible before choosing a fix

ObservationWhat it points toNext step
---------
Droplets after cooling that clear on warming or dryingMoisture; path at the seal interface or vent channelCheck the channel is open and fitted the right way, then rerun a humid cycle
A film that cannot be wiped off and does not clear with heatCondensed volatiles from adhesives and plasticsGo back to materials and cleaning; separate by a dry-out re-check
Local pooling with a visible water lineLiquid water enteredGo back to structure and seal, recheck with the protection test

This dividing line matters more than any single test, because it decides whether the corrective action goes to the structure or to the materials.

Fogging in camera images is a separate track: that article deals with the four optical material layers and the optical interface, while this one deals with the cavity side. Both can appear at once and have different causes - one is outgassing from adhesives and films, the other is moisture inside the housing.

The humidity profile also changes the verdict: cyclic versus steady-state damp heat decides whether breathing is provoked at all, and for panel assemblies the seal's own account is compression set and media compatibility.

6. Four fields the test plan has to carry

FieldWhat to writeWhy it cannot be dropped
---------
Cavity structureEnclosed or not, vent present, its location and orientationDecides which path the pressure difference takes
Temperature conditionsLimits, transition mode, number of cyclesThe difference follows the temperature span, not the absolute level
Humidity conditionsDry temperature cycling, or humidity applied with itPressure difference without vapour cannot show the pumping effect
Fogging judgementAt which temperature point, observed for how long, dry-out re-check or notWithout a fixed point, two laboratories cannot compare

On the standards side, name the volume and stop there: climatic conditions belong to the ISO 16750 standard page and the GB/T 28046 standard page, enclosure protection and level grading to the IP rating service page. All three give applied conditions and grading methods, not a prediction of whether your structure will fog.

When TMC LAB takes on this kind of job, three questions come before any condition is scheduled: is there a vent path, where is it, and which way does it face. They decide whether temperature and humidity can be applied together, and at which temperature point fogging has to be judged.

A few plain words

Fogging is not a minor cosmetic issue to be cleaned up. It is an indicator of the sealing path and a precursor to optical and electrical failures - once water is inside the cavity, the next item on the list is electrochemical migration and falling insulation resistance.

Adding a venting membrane does not lower the protection level. But a clogged membrane is the same as no path at all, and the pressure difference goes straight back onto the seal interface.

If the structure has a port, the drawing and the cleaning specification must both state which face must not be painted, labelled or jetted. Leave that out and the earlier design work is wasted.

Rather than argue in the report about whether a trace of water counts as ingress, fix the plan first: at which temperature point, observed for how long, and whether a dry-out re-check follows. Define the criterion and half the argument disappears.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

The part is rated IP67 - why does it still fog up or take on water?
Because IP67 tests whether liquid water enters during a defined immersion and time; it does not test the pressure difference across the housing. Change the temperature and the internal pressure changes with it, and without a vent path that difference can only equalise through micro-gaps at the seal interface. A few heating and cooling cycles then act like a pump that carries outside moisture in, which condenses on the coldest surface. Passing IP and fogging over time are therefore two different things - one is short-term blocking, the other is long-term breathing - and if the plan only covers the first, nobody owns the second.
If a venting membrane is fitted, can the IP test be skipped?
No - they are not substitutes. A venting membrane lets gas pass slowly and keeps liquid water outside the hydrophobic pores, which addresses pressure equalisation and slow vapour exchange; the IP test examines whether the structure survives immersion and jetting. The membrane is also a failure location of its own: if the port is clogged by mud, wax, paint or a label, the pressure difference goes back onto the seal interface; if the membrane is fitted the wrong way round, liquid water passes straight through. Both belong in the plan, and the drawing and cleaning specification should state which face must not be painted, labelled or jetted.
After fogging appears, how do I tell moisture from volatiles released by adhesives and plastics?
Look at the form and at reversibility first. Droplets on the inner surface after cooling that disappear on warming or after drying are moisture, and the path is the seal interface or the vent channel. A thin film that cannot be wiped off and does not clear with heat is usually condensed volatiles released by adhesives and plastics at high temperature, so the path is materials and cleaning. Local pooling with a visible water line means liquid water entered - a structural or seal failure, not a breathing issue. The three call for completely different corrective actions, so separate them before touching the design, or the sealing structure gets reworked while the fog stays.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826
Call