When a Test Is Interrupted, Does It Have to Start Over? Judge What the Interruption Changed, Not How Long It Lasted

Key takeaways

An interruption does not undo the stress already delivered to the sample, so how long the gap lasted is not the criterion. The criterion is whether the interruption introduced a new stress in a different direction, or an irreversible change of state. Each of the four types leaves something different behind: an inrush on power restoration, condensation, a shifted accumulation baseline, or an excitation that was already out of tolerance. Making up the time restores the duration, not what already happened. In damp heat, thermal cycling or salt spray, opening the door once adds a condition the test plan never specified. Check whether the sample changed first, whether the excitation can be trusted second, and the duration gap last.

Whether an interrupted test has to start over does not depend on how long the gap lasted. An interruption does not roll back the stress already delivered to the sample. What decides the outcome is what the sample went through at that moment: whether a new stress in a different direction was introduced, or an irreversible change of state took place. A power cut, an opened door, a re-clamped fixture and a shaker alarm each leave something different behind, and they should not be handled the same way.

Clients usually ask a single question — the run stopped for two hours, must it be repeated? That question leaves out three things: whether the chamber conditions drifted, whether the sample was powered, and what was confirmed before resuming. With any of the three missing, every answer is a guess.

1. Separate the three time segments

In the segment before the interruption, change has already happened. Ageing at the material level, accumulated damage, diffusion across an interface — none of it reverses because the run is repeated later. That segment is sunk, but it is also valid, provided the conditions really were applied as specified at the time.

The moment of interruption is where every judgement diverges. The same ten-minute stop means two different things depending on whether the power was cut or the door was opened; unloading a shaker and a chamber over-temperature alarm are two further different things.

The segment after the interruption restores duration and restores conditions. It does not restore what happened in between.

Making up the time restores the duration, not what already happened. That sentence is the backbone of the whole judgement. Any approach that treats a topped-up duration as a completed test has skipped the middle moment.

2. Four kinds of interruption leave different things behind

InterruptionWhat the sample went through at that momentWhat cannot be undone by repeating
---------
Power lossThe sample drops out and sees an inrush on restoration: surge, power-up sequencing, initialisation and spurious outputs; in a temperature test a cold start is added on topThe electrical and functional trace left at restoration, plus any drift in conditions while the power was off
Door opened for inspectionThe chamber temperature changes abruptly; a cold part meeting humid air condenses on its surface, a hot part meeting cooler air draws moisture in through the pressure differenceThe condensation and moisture uptake that already occurred, and the corrosion or leakage starting point it created
Shaker stopped and re-clampedFixture position and clamping force change, the relationship between control point and response point may change, and the damage-accumulation baseline moves with itThe damage accumulated under the original clamping, which can no longer be summed with the later segment
Alarm or out-of-tolerance stopIn the segment before the alarm the excitation may already have been outside tolerance, with nobody watchingThe stress actually applied during that segment, which is not the stress the test plan specifies

The second row is the one most often dismissed as harmless. A look inside, a photograph, nudging the sample — small motions, but in damp heat and thermal cycling they change the phase of water on the surface. Why a housing draws moisture in after a temperature swing is broken down in a separate article on pressure equalisation and breathing; see sealed housing pressure equalisation.

The fourth row deserves its own sentence: an alarm is an effect, not a cause. In the segment before the alarm the reading may have been running outside tolerance for a while, with the threshold simply not yet crossed. Handling an alarm-type interruption therefore means going back to the curve before the alarm, not counting only from the moment it sounded.

3. Where the three verdicts divide

VerdictWhen it appliesWhere the cost lands
---------
Continue with the balanceNo new stress introduced, no change of state, the accumulation basis can be joined up, and the self-check before resuming was normalOnly chamber time is extended; the premise is a complete record, otherwise the position cannot be defended later
Redo that segmentThe interruption left a stress in a different direction, or the excitation during that segment cannot be trustedThe duration of that segment is lost, but less than a full repeat — provided the segment boundary can be defined
Void the runThe interruption changed the sample's initial state: condensation or frost, re-clamping followed by refitting, the sample having been taken apartThe whole run is lost and has to be rescheduled; expensive, but the conclusion is clean

Argument usually lands on the middle verdict, and specifically on where "that segment" begins. A workable approach anchors it to an observable event: the last reading confirmed in tolerance, the last node at which the self-check passed, or the last sample inside tolerance before the alarm. If the anchor can be written down, the segment can be bounded. If it cannot, the practical result is a voided run that nobody wants to call by that name.

Fix the order of judgement as well: check whether the sample changed first, whether the excitation can be trusted second, and the duration gap last. In the reverse order the discussion becomes a contest of volume rather than of data.

4. A four-column interruption clause for the test plan

ColumnWhat it should stateWhat happens without it
---------
Permitted interruptionsWhich interruptions may be continued through (a planned mid-run inspection, a sensor swap) and which are treated as invalid outright (power loss, over-temperature, an opened door, the sample being moved)The operator decides on the spot, and the same laboratory handles the same event differently twice
State confirmation before resumingWhat to do first: stabilise or dry, inspect, run functional self-checks, re-measure key parameters, and what each of those decidesThe run is resumed directly and the drift during the gap is written into the result
Line between topping up and redoingWhich anchor defines the segment, and from which point the accumulated duration resumesThe dispute is settled by negotiation, and the outcome depends on the relationship rather than the data
Record and notificationWho records, what is recorded, when the client is informed, and whether the client must confirmThe interruption surfaces only when the report is issued, leaving the client to accept it or repeat everything

Writing those four columns costs little — usually one conversation before the chamber is loaded. What it buys is a basis for the people standing at the equipment when something stops. How decision criteria themselves are set, and how boundary readings are handled, is a separate thread covered in decision rules and boundary readings.

5. Five record items in the report

ItemWhat to recordWhat goes missing without it
---------
Time and durationThe accumulated point at which the interruption occurred and how long it lastedThe total duration loses traceability and becomes an isolated number
State at the momentWhether the sample was powered, whether the door was opened, the actual chamber readingsThe judgement loses its basis, and a harmless stop cannot be told from a changed state
CauseSupply, equipment, human action, or an anomaly in the sample itselfThere is no way to judge whether the same event will recur
Confirmation before resumingThe conclusions of stabilisation, drying, visual inspection, functional self-check and parameter re-measurementDrift during the gap is folded into the result and cannot be seen in the report
Accumulation basis afterwardsFrom which point the run resumed and how the two segments were addedThe accumulation method is unclear and the figures do not line up against another laboratory

Readers of reports should use these items too. A missing interruption record and a missing tolerance record are two different problems: the first says the history cannot be told, the second says the excitation itself is in doubt. How to read both in a random vibration report is covered in more detail in the article on reading a PSD: reading a random vibration PSD.

6. A few plain words

An interruption is not the problem; an unrecorded one is. Laboratories that have run thousands of tests still trip breakers and still find loose sensors. The difference is whether something was left behind that can be reviewed.

Do not treat a topped-up duration as a completed test. Topping up answers the duration column. What happened to the sample is a different column.

Fixing the order of judgement is more useful than fixing a uniform threshold in minutes. Thresholds are counted in minutes; what happens inside a sample is not.

In damp heat, thermal cycling and salt spray, one door opening belongs in the record. This is among the more common omissions seen in real commissions, and the one most easily blamed on something else in later judgement.

Test scheduling itself carries interruption risk, particularly when one chamber serves several lots at once. When TMC LAB handles this kind of commission, the four-column clause and the five record items are confirmed before the chamber is loaded, written into the plan alongside the profile and the acceptance criteria rather than negotiated after something stops.

How the conditions themselves are arranged and sequenced is covered separately; the combination of the five climatic stresses is set out in GB/T 28046.4 climate load combination, and the way the two document families specify conditions is broken down clause by clause on the standards pages for GB/T 28046 and ISO 16750. For commissions that need interruption handling written into the plan, the service pages on environmental reliability testing and temperature cycling set out the working basis.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

The power failed mid-test. Does the time already accumulated still count?
Look at what the sample went through at that moment, not at how long the gap was. If only the supply was interrupted, the chamber conditions never drifted, the sample and its fixture were not touched, and the self-check before resuming was normal, then continuing with the balance of the duration usually stands and the accumulated time is the sum of both sides of the gap. If the inrush on restoration left a trace on the sample — a reset, an abnormal initialisation, a spurious output — or the chamber temperature drifted outside tolerance while the power was off, that segment should be treated as invalid rather than simply topped up. Put the judgement on record: the time of the cut, the actual chamber readings, and the self-check result on resuming. With those three present, the discussion has a basis.
The chamber door was opened briefly for a look. Does the run have to be redone?
In damp heat, thermal cycling and salt spray, opening the door changes the phase of water on the sample. A cold part meeting humid air condenses on its surface; a hot part meeting cooler air draws moisture in through the pressure difference across its housing. Neither process can be recovered by making up the time, so that segment should be treated as invalid, and the whole run may need repeating. Dry heat is less affected, but the door opening and its duration still belong in the record, followed by a functional self-check and parameter re-measurement after recovery. Writing that rule into the test plan is far cheaper than arguing about it afterwards.
Which items belong in an interruption record?
Five. The time of the interruption and how long it lasted; whether the sample was powered, whether the door was opened and what the chamber actually read at that moment; the cause; what was confirmed before resuming, including stabilisation, drying, visual and functional self-checks and parameter re-measurement; and how the accumulated duration was resumed and from which point. Without the second item the judgement has no basis, and without the first and the fifth the total duration in the report has no traceability — the reader is left with an isolated number.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826
Call