Key takeaways
Boundary readings are not rare - insulation resistance, leakage current, contact resistance, emission limits and functional-status verdicts all land close to a limit. There are three possible verdicts, not two: pass, fail, and cannot decide. Which one applies is fixed by the decision rule agreed before the test, not chosen after the numbers arrive. That rule belongs in the test plan and the request form, with four elements: the source of the criterion including its version, the measurement method and uncertainty basis, how boundary cases are handled, and when a retest is triggered and how its value is used. Adding the rule afterwards is choosing the rule from the result, which is data selection. Also record actual condition values rather than set points: tolerances run both ways, and the wide side lets a bad part through while the tight side fails a good one.
A report that reads "insulation resistance 0.98 against a limit of 1.0, pass" is only half a sentence: it treats one measurement as the true value. A limit is a line; a verdict is a band. The distance between the reading and the limit has to be read together with measurement uncertainty and with how far the actual conditions sat from their set points. Near the limit there are three verdicts, not two, and forcing them into two quietly moves the risk onto one party.
Boundary parts are not a rare case either. Temperature class, vibration level, leakage current, contact resistance, emission limits and functional-status verdicts all land close to a limit far more often than reports suggest.
This piece covers one thing only: how a reading is compared against a limit. Why data before and after a test do not agree is covered in why the numbers drift between runs; how many parts are needed for a verdict is covered in sample quantity and representativeness; the functional-status language from A to E is covered in functional status in GB/T 28046.1.
1. Three different boundaries, kept apart
The word "boundary" in daily use covers three separate things, each with a different source.
The criterion boundary is the limit itself, in three shapes: absolute limits such as insulation resistance, leakage current, contact resistance or emission limits; drift limits such as a percentage change from the initial value; and attribute criteria such as which functional status was reached, whether a reset occurred, whether cracks appeared. Standards usually supply grading language and application conditions, while the actual threshold lives in the OEM standard, the technical agreement or the part specification.
The measurement boundary is how accurate the reading is. Instrument accuracy, fixture and leads, probe position and the moment of reading all move the number. The same part in the same chamber can change verdict with a different probe position, as set out in measurement comparability.
The condition boundary is how much stress the part actually saw. A set point is never the same number as the actual value: the control sensor and the part surface are not one temperature, the control-point vibration level differs from the level at the part across the fixture, and the source voltage differs from the terminal voltage across line losses.
| Boundary | Who supplies it | Which report column it lands in | What happens on the boundary |
|---|---|---|---|
| --- | --- | --- | --- |
| Criterion | Standards grade, OEM and agreement set thresholds | Verdict and basis of judgement | Change the threshold and the same numbers flip |
| Measurement | Method and instrument, including uncertainty | Method and results | Probe, fixture or timing shifts the number |
| Condition | Standards give tolerance, agreement gives the level | Conditions and recorded actuals | Which side of tolerance it fell on decides a boundary part |
Mix the three and you get the familiar deadlock - "our reading passes, your verdict fails" - where the two sides are describing three different boundaries.
2. Three verdicts, not two
A decision rule has a specific meaning in accreditation language: how a measurement result is compared with a limit to reach a conformity statement, taking uncertainty into account. It is part of the method, not a piece of wording added once the result is known.
| Decision rule | How it compares | Boundary reading | Where the risk sits |
|---|---|---|---|
| --- | --- | --- | --- |
| Simple comparison | Reading against limit, direct | Compared as-is, no band | Shared in theory, usually borne by the user |
| Guard band | Limit pulled inward, then compared | Inside the band: retest per agreement or record cannot decide | Wider band lowers false verdicts, raises rework |
| Data only | Results and method, no conformity statement | No verdict issued, user decides | Entirely with the user |
The middle option is not vagueness. "Cannot decide" is the honest answer: what can be decided is decided, and what cannot means the data sit too close to the limit to be separated by the measurement available.
Drop it and the issuing party silently absorbs the risk for the stretch the criterion never covered. In the other direction, a part near the limit can flip verdict with another probe position, another fixture, another reading moment. Nobody did anything wrong: the criterion sits at a point while the measurement sits in a distribution, and the two were never the same precision.
One point is regularly missed: the force of the word "pass" in a report reaches only as far as the decision rule behind it. What an auditor asks about is rarely the number, but which rule produced the verdict.
3. Condition tolerance pushes the same part both ways
A standard supplies a permitted deviation, not "exactly the set point". Values come from the current text and the customer agreement; no numbers are copied here, only directions.
| Applied quantity | What reports usually state | How the actual value deviates | Effect on a boundary part |
|---|---|---|---|
| --- | --- | --- | --- |
| Temperature and humidity | Chamber set point and dwell | Control sensor, part surface and chamber positions differ | High side accelerates, low side lets through |
| Vibration and shock | Control-point level and spectrum | Fixture transmission, part-side point and mounting attitude change the response | A soft fixture under-stresses the part |
| Supply voltage and current | Source set point | Line loss, contact resistance, load variation | Terminal voltage is not the source value |
| ESD and field strength | Set voltage or field level | Discharge network, coupling path, set-up tolerance | Injected energy does not fully match the setting |
Tolerance runs both ways while the criterion runs one way, and only the combination decides a boundary part's fate.
Falling on the wide side produces a false pass: a part at the edge of non-conformity reads as conforming because the conditions were mild. Falling on the tight side produces a false fail, and that verdict is rarely appealed, because doing the job again is easier than arguing. A false pass surfaces at the customer; a false fail is known only to the supplier, which is why it leaves almost no trace in the data.
Separate chamber temperature from part-surface temperature. A compliant control point does not mean a compliant part, especially where there is self-heating, a load, or a large thermal mass. That is why loading and probe position belong in the plan rather than in the optional column.
4. The rule is written before, not added after
Putting the decision rule in the plan costs little. Adding it afterwards changes what the exercise is.
Four things belong in the plan: the source of the criterion, down to file and version rather than "per the national standard"; the measurement method and uncertainty basis, naming probe points, fixtures and reading moments; the boundary handling, whether a guard band applies or the case is recorded as undecidable; and the retest rule, with its trigger, permitted count and the way the value is used.
A rule added after the fact is a rule chosen from the result. With the same dataset, fixing the band width after seeing the numbers always tilts the verdict to one side. That is not rigour; it is data selection. When customers assess a laboratory, a complete decision rule is one of the items they check, as set out in what to verify in a test laboratory.
Retesting has three disciplines. Retest only under the trigger agreed in advance, never because a result looked bad; fix the number of retests and the way their values are combined beforehand, since taking the less favourable value and taking the mean are different answers; and never use a retest to hunt for a compliant number. A retest exists to confirm the measurement is stable, not to give the data a second chance.
| Column | What to state | What it costs when omitted |
|---|---|---|
| --- | --- | --- |
| Source of criterion | File, version, clause location | A revision removes the basis of the verdict |
| Method and uncertainty | Probe points, fixture, reading moment, basis | A different operator produces a different number |
| Boundary handling | Band width, how undecidable cases are recorded | Boundary verdicts depend on the moment |
| Retest rule | Trigger, count, how values combine | Retesting turns into data picking |
Once those four columns are in the test plan and the request form, the report's verdict has a traceable premise. GB/T 28046 and ISO 16750 supply application conditions and judgement grades; neither will set a guard-band width for you. The same holds on the emission side: CISPR 25 supplies limits and detector practice, while boundary handling still belongs in the agreement. How broadband and narrowband classification affects reading stability is covered in broadband versus narrowband.
Condition tolerances for climatic and mechanical work, and the extra measurements a boundary part deserves, land on the request forms for temperature cycling and for EMC. The filling differs; the four columns do not.
A few plain words
- A report that says "pass" without a decision rule has delivered half a sentence, and that half is what audits ask about first.
- Write the source of the criterion down to file and version. "Per the national standard" stops meaning anything the moment it is revised.
- Record actual condition values, not set points. A compliant control point with a non-compliant part is a real combination.
- A retest is part of the method, not a second chance for the data. Without a pre-agreed trigger the verdict does not hold.
- Tolerance runs both ways while the criterion runs one way. A false pass surfaces at the customer and a false fail stays with the supplier, so both need handling in the plan.
- TMC LAB settles the decision rule and the retest trigger before discussing condition levels on disputed boundary cases, because the reverse order means every dataset has to be explained again.
Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.