  4. The Report Behind PPAP Is Not Your DV Report - Design Validation and Production Validation Differ in Where the Samples Came From

The Report Behind PPAP Is Not Your DV Report - Design Validation and Production Validation Differ in Where the Samples Came From

Key takeaways

The difference between DV and PV is not the test procedure but the sample space. DV samples represent the design and may differ from the production process, provided the differences are documented; PV samples must come from production tooling, production takt and production operators. PV catches process variation - assembly tolerance stack-up, coating thickness distribution, sealant volume, drift in welding parameters - that DV cannot see, because DV samples are usually hand-picked. The reverse also holds: passing PV says nothing about design margin. Get the direction wrong and the corrective action aims at a target that is not there.

When a customer says "send me the PPAP report", forwarding the DV report usually gets it bounced back. The test was rarely run wrong; the sample origin does not match. DV runs on parts that represent the design, while PV runs on parts built with production tooling, production takt and production operators. Same test items, same criteria, two different documents. DV answers for the design, PV answers for the process, PPAP answers for release. Mixing the three costs a whole test round, not a file rename.

1. Three terms, three questions

Design Validation (DV) answers whether the design works: whether design output meets design input and the conditions written into the customer specification. Production Validation (PV) answers whether the line still makes it right: whether parts built with production tooling, production takt, production operators and the production environment still meet the same criteria. Production Part Approval Process (PPAP) answers whether the process can be released to volume production. PPAP is not a test; it is a submission package.

That package has many slots: design records, engineering change documents, DFMEA and PFMEA, process flow diagram, control plan, measurement system analysis, dimensional results, material and performance test results, initial process studies, laboratory qualification documents, appearance approval report, part submission warrant. The PV test report usually sits in the material and performance test results slot, which is why people say "PPAP report" when they mean the PV report. They are not the same thing: PPAP is the package, the PV report is one slot in it.

TermQuestion it answersWhere samples come fromWho signs off
------------
DV design validationDoes design output meet design inputProduction-representative parts; differences from the production process allowed if documentedDesign and project functions, countersigned by the customer design function
PV production validationDoes the product still meet the same criteria under volume conditionsProduction tooling, takt, operators and environmentQuality and project functions, accepted by the customer SQE
PPAP production part approvalCan this process be released to volume productionDrawn from a production batchCustomer, per the specified submission level

The relationship is sequential, not substitutable. That is easy to say and easy to bend once the schedule tightens: two rounds collapse into one, and two reports still get written.

2. Same test items, the difference sits in four fields

Thermal cycling, vibration, EMC - DV and PV often both require them, and the criteria frequently stay word for word identical: same customer specification, same functional status requirement. The difference is not in the test procedure but in four fields.

FieldWhat a DV report statesWhat a PV report states
---------
Sample originPilot or tooling samples, with the differences from the production process listedProduction line, tooling and takt, with build date and batch
Change baselineDesign changes, deviations and concessionsProcess changes, tooling and equipment status, control plan revision
Source of criteriaDesign specification and customer technical agreementThe same criteria plus the process parameters in the control plan
Intended useDesign releasePPAP submission and production release

PV catches what DV usually cannot, because the variable has moved: tolerance stack-up in assembly, coating thickness distribution across positions on the rack, sealant volume and dispense path, batch-to-batch drift in welding parameters, incoming lot variation. All of these are natural process variation, and DV samples are usually hand-picked - the picking removes the variation.

The reverse holds too. Passing PV says this production batch met the criteria; it says nothing about design margin. Margin is what the DV round answers.

So the two rounds point at different failures. A failure in DV sends you to design, part selection, material system. A failure in PV sends you to tooling, parameter window, incoming control. Read the direction wrong and the corrective action aims at a target that is not there.

Conditions come from standards, criteria come from the agreement. For environmental and mechanical items, the condition columns can be worked through clause by clause against GB/T 28046 environmental testing and ISO 16750; which criteria each round uses, and whether the baseline is the initial value or an absolute limit, is settled by the customer technical agreement.

3. Which one PPAP wants depends on the level and the slot

The submission level is set by the customer; the supplier does not pick it.

Submission levelWhat is submittedIs a DV report enough
---------
Level 1Part submission warrant onlyNegotiable when the customer does not ask for test data
Level 2Warrant, samples, limited supporting dataDepends on which items the customer names
Level 3Warrant, samples, complete supporting dataNot enough; material and performance results generally must come from production parts
Level 4Warrant plus other requirements specified by the customerWork through the customer list item by item
Level 5Warrant, samples, complete data, reviewed at the supplier siteNot enough, and the report must be traceable to raw records on site

This is the general framework; what is actually submitted follows the customer specific requirements.

A simple test: if the customer names material and performance test results and your data came from DV samples, that slot cannot be filled. Filling it anyway is a misrepresentation, and a second-party audit reading raw records will see it as soon as sample origin, build date and batch number are compared.

4. Six recurring mistakes

  1. Submitting the DV report as the PPAP report. The report itself is fine; the sample origin field does not match, and the rework costs more than scheduling PV in the first place.
  2. Using leftover DV samples for PV. The two reports end up describing identical samples, and the auditor will ask which line and which day produced them.
  3. Re-running only PV after a design change. A design change goes back to DV; only a process change stays within PV. The reverse omission is more common: tooling modified, line relocated, supplier switched, and PV never repeated.
  4. Treating a PV pass as proof of process capability. PV verifies product performance; capability is answered by the initial process study. Two questions, two conclusions.
  5. Validating with fully hand-built samples and extrapolating to volume. DV samples are also expected to come from a meaningful production process; hand-built parts only show that the design concept holds.
  6. Leaving sample origin and process differences out of the report. An empty field hands the interpretation to the auditor.

5. Four questions before quoting, two fields inside the report

The four questions: which PPAP slot this report fills; whether line, batch and takt must be stated; which submission level applies; whether criteria come from the customer specification or from a national or industry standard.

The two fields: a sample origin statement, and the differences from the production process. Fill both and the report needs no verbal footnotes at a second-party audit.

TMC LAB writes sample origin, source of criteria and intended use into the test plan before work starts, because the intended use changes how granular the report has to be. Whether a report can be traced back to raw records is covered by the three points in IATF 16949 and report acceptance; how to verify a laboratory's scope is set out in six checks when choosing a test laboratory. The project entry for EMC work is EMC testing, and on the environmental side thermal cycling and vibration are handled separately. Where a change comes from a part substitution, the six-layer compatibility table in requalification after switching to a domestic automotive-grade chip shows which layer the re-test belongs to.

6. A few plain words

DV and PV are not two rounds of the same work; they are two different sample spaces. Writing that sentence into the APQP plan is cheaper than explaining it after the report is rejected.

Ask which report and which level at the quotation stage, and put the answer in the test plan. State which line built the samples and which document the criteria came from - those two fields decide whether the report is accepted.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

The customer only wants one report - can DV and PV be combined into a single run?
Some OEMs allow combining them for carry-over or facelift parts, but only when the customer technical agreement or the APQP plan says so, and the report still has to keep separate criteria and separate sample-origin statements for both rounds. Combining means one sample batch, two sets of records, two conclusions - not one report with a new file name. If the samples came off a pilot line, the combined result only supports a design-side conclusion and the production side still has to be covered, which needs to be said when the schedule is set.
Which batch must the PV report be based on for PPAP submission?
A production batch built with production tooling, production takt, production operators and the production environment, with the build date, batch number and line identifiable in the report. Substituting pilot parts or leftover DV samples leaves the two reports describing identical samples, which is obvious to a second-party auditor reading the raw records. Note also that passing PV only shows that this batch met the criteria; process capability is answered separately by the initial process study, and neither substitutes for the other.
If the design change is one resistor, does PV have to be repeated?
First see which layer the change lands on. A change that alters the design record and affects design output goes back to DV; only changes affecting the process - tooling, equipment, line, incoming control - stay within PV. In practice the more common omission runs the other way: tooling was modified, the line was relocated, or a supplier was switched, and PV was never repeated. Draw the line between carry-over and re-test as a written change-impact conclusion and have the customer SQE confirm it, rather than settling it verbally in a project meeting.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.