Same Part, Two Labs, Readings a Notch Apart - The Gap Sits in Four Layers That Rarely Reach the Report

Key takeaways

When two laboratories disagree, split the difference into layers before blaming the instrument. Of the four layers - setup, settings, conversion, decision basis - the first three move the number and the fourth moves the verdict. Reconcile conditions first, raw data second and verdicts last; reversing the order turns "both passed" into a false claim of agreement.

Send the same part to two laboratories and the readings will come back a notch apart. That is normal, not an incident. Before deciding who tested it wrong, split the difference into four layers: setup and site, receiver settings, reading conversion, and the decision basis. Three of those four rarely reach the report, so the two documents can only be compared at the level of numbers, never at the level of comparability.

1. Split the difference into layers before blaming the instrument

Putting two receivers side by side and comparing accuracy usually produces nothing. The annual drift of a single instrument is often smaller than the spread introduced by any one of these four layers.

LayerWhat it changesHow the report usually records it
---------
Setup and siteHow much field the part actually seesOne phrase: "arranged per the standard"
Receiver settingsWhich components the sweep actually catchesDetection mode and bandwidth only
Reading conversionHow port voltage becomes field strengthUsually absent
Decision basisWhich limit revision, compared against which quantityThe standard number only

All four move the number, but not in the same way. The first two move the physics; the last two move the number and the comparison point. When the physics moves, the part really did see a different stress, and the two results were never supposed to match. When only the number moves, the part is unchanged and the conclusion changes anyway. The second case is harder to handle because it leaves no trace; both reports look perfectly proper.

2. What the receiver sees is decided by the sweep

A frequency sweep is not a photograph, it is sampling. The receiver stops at each point of a step, reads, and moves on. Whatever it never stopped at, it never saw.

A coarse step walks straight past a narrowband peak. A narrowband disturbance may occupy only a sliver of spectrum; one step and it is gone, with the reading dropping back to the noise floor. Two sweeps with different steps, one catching the peak and one missing it, both count as "swept per the standard".

If the dwell time is shorter than the repetition interval of the disturbance, even a peak detector misses the high point. A peak detector reports the high point during the dwell, not the high point over the whole run. For a low pulse repetition rate, or for a disturbance that is intermittent - appearing only when some function wakes up - insufficient dwell means an underestimate.

A preamplifier is not free of side effects. It lifts small signals at the end of the cable above the noise floor, and it lifts the total level with them. Lift too much and the receiver goes into overload. The reading after overload is not simply high; it is compression, spurious responses and harmonics mixed together. The trace looks clean and is no longer the signal.

How detection modes divide the work, and how broadband is separated from narrowband, is a separate line of reasoning, covered in broadband versus narrowband classification. One rule is enough here: with the same detection mode, sweep parameters alone can still shift the same signal by a visible margin.

3. How much reaches the part is decided by the setup

A radiated emission test measures the energy the part launches into space. How much the antenna collects depends on how the part is positioned, how the harness runs, and how far away and how high the antenna sits.

In the report these items are usually compressed into "arranged per the standard". Reproducibility dies inside that sentence.

Setup itemTwo common practicesEffect on the reading
---------
Harness length and routingKeep slack and follow the vehicle route, or run it straight and shortRouting changes the radiation pattern, not the noise level
Harness terminationReal vehicle load, or a specified simulated loadA different load is a different source
Orientation and turntable angleFix one angle, or rotate and take the high pointOne angle and a full rotation are not the same test
Operating modeStandby, full load, communicatingDifferent modes have different spectral structure

Setup decides how much reaches the antenna. This layer connects to chamber noise floor and site validation: the floor judges the report, the limit judges the part, and neither substitutes for the other. That split is set out in chamber noise floor and site validation, and the four setup elements are covered in the CISPR 25 radiated emission setup.

One sentence that often gets skipped: the information content of "arranged per the standard" depends entirely on what sits in the brackets. With harness slack, termination, orientation and operating mode written down, two reports have a basis for reconciliation. Without them, only the verdicts can be compared.

4. One more step between the reading and a comparable quantity

The receiver port reads voltage; the limit is written as field strength for radiated tests, or as terminal voltage and current for conducted tests. Several conversions sit in between. None can be dropped and none can have its sign reversed.

Conversion itemAdded or subtractedConsequence of getting it wrong
---------
Antenna factor (radiated)AddedWhole curve low, false pass likely
Probe transfer impedance (conducted)SubtractedCurrent reading offset across the band
Cable lossAddedOptimistic reading, worse with longer cable
Preamplifier gainSubtractedSign reversed, whole curve shifts by the gain
Impedance mismatch correctionPer the correction tableError concentrated on narrowband peaks

All of these vary with frequency; none is a constant. Antenna factor and cable loss rise with frequency, and amplifier gain is not perfectly flat in band. So the intuition that two laboratories differ by "a fixed amount" does not hold: in the same pair of reports, the low end may differ slightly and the high end may differ by a visible margin.

One more item is often treated as a formality: calibration validity. Antenna factor, probe factor and amplifier gain all carry a calibration interval. An expired calibration does not mean "the same number as before"; it means "nobody knows which number". Its value in the report is telling the reader which calibration the figures came from.

This layer rarely appears in the document. The two sets of numbers are then left without a common zero, and comparing them in either direction means nothing.

5. Reconciling two reports: conditions first, verdicts last

Two reports side by side must be read in order.

OrderWhat is comparedWhen it breaks down
---------
Conditions firstSetup, settings, conversion, limit revisionAny missing item voids the rest
Raw data secondSpectrum plots, sweep parameters, noise floor tracesVerdict page only, and this layer is gone
Verdicts lastDecision level and marginAgreement here is coincidence if the first two do not match

Reversing the order produces a wrong conclusion: both laboratories passed the part, therefore the data agree. "Both passed" only means each result sat below its own limit; it does not mean both measured the same thing.

There is a practical test for reconciliation: trust the report that can evidence itself. That means four things written down - setup, settings, conversion chain, decision basis. A report with all four is reproducible even when its reading is conservative.

6. A few plain words

Writing the four columns into the request form before shipping samples is one of the few actions available in advance: how the setup will be arranged, which settings will be used, which revision of the conversion factors applies, and which limit revision governs. Once they are written down, a later measurement has something to be reconciled against.

For retests, stay with the same laboratory and the same settings where possible. Internal consistency is easier to obtain than cross-laboratory consistency, and it costs less effort - the first needs only that you do not forget your own configuration, the second needs both sides to document all four layers.

When a difference does appear, read the condition table first, not the smaller number. A lower reading is not stricter; it may simply be missing a conversion term.

The division of standards is worth one line as well: CISPR 25 supplies limits, setup and measurement procedure; measuring equipment and uncertainty are governed by a separate family of documents; and the immunity side falls under ISO 11452, which is not the same set. All conditions follow the current revision and the customer technical agreement, and no values are preset in this article.

When TMC LAB takes on this kind of work, the four setup elements, the sweep settings, the conversion chain and the decision basis all go into the test plan and the report, so a customer reconciling two documents can match them column by column.

To fix the limit level by mounting location, start with how Class 1 to Class 5 are selected. To locate a source before running the formal chamber test, near-field probing is the other route. The full radiated emission group sits under EMC services, with the individual method under radiated emission.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

Two laboratories read the same part differently. Did one of them test it wrong?
Usually neither is wrong; the four layers simply differ. Setup covers harness routing, termination load, orientation and operating mode. Receiver settings cover step size, dwell time and the preamplifier. Conversion covers antenna factor, cable loss, amplifier gain and mismatch correction. The decision basis covers the limit revision and the class. The first two layers move the physics, the last two move the number and the comparison point. The test is simple: can the two condition tables be matched column by column? If not, the readings have no common ground, and the question of who is right does not arise.
For a retest, should we return to the same laboratory or use a second one cross-check?
It depends on the purpose. To judge whether a design change worked, return to the same laboratory and keep the same settings, so the before-and-after difference means something; internal consistency is easier to obtain than cross-laboratory consistency. Use a second laboratory for an inter-laboratory comparison or when the customer requires independent verification, and write all four columns - setup, settings, conversion, decision basis - into the condition table when you submit. Otherwise the two reports can still only be compared at the verdict level. Mixing both purposes in one submission usually satisfies neither.
A report says only "tested to CISPR 25". Can it be used for reconciliation?
For verdicts, yes; for data, no. The standard number states the method and the source of limits, not the harness slack, termination load, part orientation, operating mode, sweep step, dwell time, or which revision of the conversion factors was applied. Without those, the two sets of numbers share no reference point and comparing them is meaningless. Asking for a condition table is easier and more readily accepted than asking for a full retest.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone