Key takeaways

Pulses 1, 2a, 2b, 3a and 3b are five recorded vehicle events, and the numbering says nothing about severity. What reaches the part is set by source impedance: high-impedance pulses test withstand voltage and isolation, low-impedance pulses test junction temperature and the regulation loop, and the same part often answers those two in opposite ways. Pulses 3a/3b are bursts with nanosecond rise times, millisecond burst duration and repeated application, coupling in capacitively and showing up as resets and communication errors rather than supply damage. A report that says only that the part passed ISO 7637-2 is not comparable; it must state the pulse list, open-circuit voltage and source impedance, application point, operating mode, repetition and intervals, acceptance level and monitoring method.

Pulse numbers follow the order in which vehicle events were recorded, not their severity. Get that wrong and the protection margin goes to the wrong place: pulse 1 swings far higher, but its source impedance is high enough to cap the current, while pulse 2b swings only tens of volts yet its source impedance is close to a short, so it can push current for seconds. Which one is harder to survive depends on the part, not on the number.

1. Five pulses, five real events in the vehicle

First, the scope. ISO 7637-2 covers supply lines of 12 V and 24 V systems only; it deals with transients conducted in along the power wiring. Coupling onto signal lines is a different document, and electrostatic discharge is another one again. Treating it as the general charter for automotive immunity is a common misplacement.

Pulse and the vehicle event it simulatesPolaritySource impedance and durationWhat it mainly stresses
------------
1: an inductive load in parallel with the part is switched off (relay, solenoid coil)NegativeHigh impedance, millisecondsInput withstand voltage, isolation, creepage
2a: current in harness inductance in series with the part is suddenly interrupted (fuse blows, connector separates)PositiveMedium impedance, microsecondsResponse speed of the clamping device
2b: a DC motor keeps spinning as a generator after ignition off (wiper, fan)PositiveVery low impedance, secondsJunction temperature and the regulation loop under sustained overvoltage
3a/3b: fast transient bursts from switching (contact bounce, arcing)Negative / positiveMedium-high impedance, nanosecond rise, microsecond pulses, millisecond burstsParasitic paths in the input filter and the digital side
4: supply voltage drop while cranking-Low voltage, secondsUndervoltage reset and function retention during starting
5a/5b: load dump (generator loses the battery clamp)PositiveLow impedance, millisecond tailEnergy absorption and clamp depth

The last row has an article of its own (load dump 5a versus 5b); it sits in this table only for orientation - load dump is the single item in this family judged by energy rather than by voltage amplitude.

As for pulse 4, the current ISO 16750-2 specifies the whole voltage-time curve more completely as a starting profile. Which document owns that segment, and how it is written, has changed between versions, so write the outline against the text of the applicable version instead of quoting clause numbers from memory.

2. Source impedance is what sets the energy

A pulse generator can be read as an ideal voltage source in series with an internal resistance. At the part, the voltage seen is set by the division between the two, and the current is limited by that resistance.

A high-impedance pulse tests withstand voltage. The open-circuit voltage is high, the current is capped, and the injected energy is limited. Failures show up as breakdown, flashover or creepage tracking, not as heating. When a part fails this one, the input stage usually lacks voltage margin or has an isolation problem.

A low-impedance pulse tests heat and the loop. The open-circuit voltage is modest, but the impedance is close to a short, so the part has to hold the line with its own regulation loop and input capacitance. If it cannot, the result is a rising junction temperature, a downstream undervoltage and a reset. Fixes here usually land on thermal design and loop response, not on a higher-voltage device.

That is where the sentence "pulse 1 is worse than 2b" goes wrong: it treats amplitude as severity. For one and the same part, the two tests often produce opposite verdicts.

One step further: a report that says only that the part passed ISO 7637-2 carries almost no information. Which pulses were applied, what open-circuit voltage and source impedance were used, where the pulse was applied, what operating mode the part was in, which functional status level was applied - without those five, two reports cannot be compared and neither can be reproduced.

3. 3a/3b are bursts, not single pulses

The waveform of 3a and 3b differs from the rest: nanosecond rise times and microsecond individual pulses, but they are applied as bursts lasting milliseconds and repeated throughout the test period.

Two consequences follow.

First, the coupling path is largely capacitive. Filter parasitics, connector distributed parameters and the coupling between traces and enclosure decide how much energy bypasses the common-mode choke. Fixes for these two therefore land on layout and filter parasitics rather than on the clamping device.

Second, the consequence usually shows up on the digital side. The supply looks fine, yet communication drops frames, the MCU resets, ADC readings jump. If the acceptance criterion says only "function normal", none of that gets recorded - it needs monitored quantities, sampling capability and an acceptance level written together.

One more confusion to clear: 3a/3b are not ESD. ISO 10605 covers discharge from a human hand or a tool, with faster edges, more concentrated energy per event and a low repetition rate; 3a/3b cover switching in the vehicle, with less energy but a high repetition rate. The remedies overlap, the conclusions do not transfer.

4. Acceptance is not "nothing broke" - it is functional status and recovery

Acceptance itemWhat to writeWhat happens if it is missing
---------
Functional status levelOne specific level from A to EThe report has observations, not a conclusion
Recovery modeSelf-recovering / needs reset / needs power cycle / not recoverableA non-recoverable result is recorded as recoverable
Monitored quantities and samplingWhat is monitored, how fast, when recordedNanosecond events slip past routine polling
Condition record during the testWhat is re-checked after each applicationCumulative damage is read as a single-event result

The functional status column is often reduced to half a sentence. Judging A and judging C are projects of different difficulty; leave the level open and the test cannot be closed out (the A to E levels are covered separately).

The recovery column is frequently dropped. A part that enters protection after a pulse and recovers on its own, versus one that needs the vehicle power cycled, are two very different outcomes for a customer - the first fits inside a functional status grade, the second may be a breakdown call-out on an aftermarket part.

5. Seven columns the outline has to carry

ColumnWhat to writeWho decides
---------
Applicable version and partWhich revision, which part, whether a company standard is layered on topCustomer technical agreement
Pulse listWhich pulses, and why the others are excludedCustomer plus functional level analysis
Open-circuit voltage and source impedanceBoth, not the voltage aloneStandard clause or agreement
Application point and harnessWhich end, harness length and routingConfirmed by both sides
Operating modeSleep / standby / awake / full load, listed one by oneCustomer defines the states
Repetition and intervalsSingle or repeated, polarity combinations, cooling intervalsStandard or agreement
Acceptance and monitoringFunctional status level, monitored quantities, recording methodCustomer and technical agreement

Of these seven, the laboratory can decide on its own only the execution details of how the pulse is applied. The other six come either from the standard text or from the customer technical agreement. A report that can be reproduced rests on all seven being written down, not on the equipment model.

The national-standard side has its own seam: the electrical loads part of GB/T 28046 organises its items around the state of the supply system - DC supply voltage, overvoltage, superimposed alternating voltage, starting profile, load dump - while the pulse waveforms themselves are defined in ISO 7637-2. One governs system states, the other governs transient events along the wiring, so the outline has to state which document supplies each condition rather than choosing one of them (the three basic electrical load items). German projects layer LV 124 on top, where pulse shape and count follow the company standard, not the national one.

The 12 V and 24 V condition sets differ throughout the pulse family as well; the difference between the two systems covers the same trap, and how ISO 16750 relates to GB/T 28046 covers version years and the framework itself, including the part structure of ISO 16750.

6. A few plain words

If someone hands you a report and says the part "passed 7637", ask four questions: which pulses were applied, what source impedance was set, what state the part was in, and which acceptance level was used. If all four have answers, the report is usable. If not, it proves the equipment was working that day.

Do not decide whether pulse 1 or 2b is harder by looking at the numbering. Look at the input stage, at how sensitive the downstream is to undervoltage, and at the thermal margin. Swap one DC-DC on the same platform and the answer can change.

When TMC LAB takes on this kind of commission, the pulse list and source impedance go on the front page of the outline, together with the pulses that were left out and the reason - not for the archive, but because the next person who asks why this part only ran three pulses needs the answer to be on paper.

The split between BCI and radiated immunity follows the same logic: establish which path is under test before discussing margin. Lighting parts have their own note on the transient path (transient immunity of LED drivers), which describes what happens when this same pulse family reaches a constant-current loop. The service entry point is EMC testing.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

Which is more severe for a part, pulse 1 or pulse 2b?
Neither the number nor the amplitude settles it. Pulse 1 swings far higher, but its source impedance is high, so the current is capped and the test is really about input withstand voltage, isolation and creepage. Pulse 2b swings only tens of volts, yet its source impedance is close to a short and it can supply current for seconds, so the test is about junction temperature, input capacitance and the regulation loop. The same part often answers these in opposite ways: a DC-DC with ample voltage margin may pass pulse 1 easily and still run its junction temperature up under a sustained 2b overvoltage. What decides it is the input stage, how sensitive the downstream is to undervoltage, and the thermal margin.
Why should pulses 3a and 3b not be handled like a single pulse?
Because their shape is a burst: nanosecond rise times, microsecond individual pulses, applied repeatedly in millisecond-long trains. That produces two consequences. First, the coupling path is largely capacitive - filter parasitics, connector distributed parameters and trace coupling decide how much energy bypasses the common-mode choke, so the fix lands on layout and parasitics rather than on the clamping device. Second, the consequence usually appears on the digital side: the supply survives, but communication drops frames, the MCU resets, readings jump. The acceptance criteria therefore have to state the monitored quantities, the sampling capability and the functional status level, or those effects are simply never recorded.
What does a report that only states "passed ISO 7637-2" actually tell you?
It tells you the equipment worked that day, not that the part is adequate in the vehicle. To be comparable it needs six things: which pulses were applied and why the others were not; the open-circuit voltage and the source impedance (voltage alone is not enough, since source impedance sets the energy); where the pulse was applied and the harness length and routing; whether the part was asleep, standby, awake or at full load; the number of applications, the polarity combinations and the cooling intervals; and which functional status level from A to E was used, what was monitored and how fast it was sampled. Drop any one and two reports can neither be compared nor reproduced.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826
Call