Key takeaways
Pulses 1, 2a, 2b, 3a and 3b are five recorded vehicle events, and the numbering says nothing about severity. What reaches the part is set by source impedance: high-impedance pulses test withstand voltage and isolation, low-impedance pulses test junction temperature and the regulation loop, and the same part often answers those two in opposite ways. Pulses 3a/3b are bursts with nanosecond rise times, millisecond burst duration and repeated application, coupling in capacitively and showing up as resets and communication errors rather than supply damage. A report that says only that the part passed ISO 7637-2 is not comparable; it must state the pulse list, open-circuit voltage and source impedance, application point, operating mode, repetition and intervals, acceptance level and monitoring method.
Pulse numbers follow the order in which vehicle events were recorded, not their severity. Get that wrong and the protection margin goes to the wrong place: pulse 1 swings far higher, but its source impedance is high enough to cap the current, while pulse 2b swings only tens of volts yet its source impedance is close to a short, so it can push current for seconds. Which one is harder to survive depends on the part, not on the number.
1. Five pulses, five real events in the vehicle
First, the scope. ISO 7637-2 covers supply lines of 12 V and 24 V systems only; it deals with transients conducted in along the power wiring. Coupling onto signal lines is a different document, and electrostatic discharge is another one again. Treating it as the general charter for automotive immunity is a common misplacement.
| Pulse and the vehicle event it simulates | Polarity | Source impedance and duration | What it mainly stresses |
|---|---|---|---|
| --- | --- | --- | --- |
| 1: an inductive load in parallel with the part is switched off (relay, solenoid coil) | Negative | High impedance, milliseconds | Input withstand voltage, isolation, creepage |
| 2a: current in harness inductance in series with the part is suddenly interrupted (fuse blows, connector separates) | Positive | Medium impedance, microseconds | Response speed of the clamping device |
| 2b: a DC motor keeps spinning as a generator after ignition off (wiper, fan) | Positive | Very low impedance, seconds | Junction temperature and the regulation loop under sustained overvoltage |
| 3a/3b: fast transient bursts from switching (contact bounce, arcing) | Negative / positive | Medium-high impedance, nanosecond rise, microsecond pulses, millisecond bursts | Parasitic paths in the input filter and the digital side |
| 4: supply voltage drop while cranking | - | Low voltage, seconds | Undervoltage reset and function retention during starting |
| 5a/5b: load dump (generator loses the battery clamp) | Positive | Low impedance, millisecond tail | Energy absorption and clamp depth |
The last row has an article of its own (load dump 5a versus 5b); it sits in this table only for orientation - load dump is the single item in this family judged by energy rather than by voltage amplitude.
As for pulse 4, the current ISO 16750-2 specifies the whole voltage-time curve more completely as a starting profile. Which document owns that segment, and how it is written, has changed between versions, so write the outline against the text of the applicable version instead of quoting clause numbers from memory.
2. Source impedance is what sets the energy
A pulse generator can be read as an ideal voltage source in series with an internal resistance. At the part, the voltage seen is set by the division between the two, and the current is limited by that resistance.
A high-impedance pulse tests withstand voltage. The open-circuit voltage is high, the current is capped, and the injected energy is limited. Failures show up as breakdown, flashover or creepage tracking, not as heating. When a part fails this one, the input stage usually lacks voltage margin or has an isolation problem.
A low-impedance pulse tests heat and the loop. The open-circuit voltage is modest, but the impedance is close to a short, so the part has to hold the line with its own regulation loop and input capacitance. If it cannot, the result is a rising junction temperature, a downstream undervoltage and a reset. Fixes here usually land on thermal design and loop response, not on a higher-voltage device.
That is where the sentence "pulse 1 is worse than 2b" goes wrong: it treats amplitude as severity. For one and the same part, the two tests often produce opposite verdicts.
One step further: a report that says only that the part passed ISO 7637-2 carries almost no information. Which pulses were applied, what open-circuit voltage and source impedance were used, where the pulse was applied, what operating mode the part was in, which functional status level was applied - without those five, two reports cannot be compared and neither can be reproduced.
3. 3a/3b are bursts, not single pulses
The waveform of 3a and 3b differs from the rest: nanosecond rise times and microsecond individual pulses, but they are applied as bursts lasting milliseconds and repeated throughout the test period.
Two consequences follow.
First, the coupling path is largely capacitive. Filter parasitics, connector distributed parameters and the coupling between traces and enclosure decide how much energy bypasses the common-mode choke. Fixes for these two therefore land on layout and filter parasitics rather than on the clamping device.
Second, the consequence usually shows up on the digital side. The supply looks fine, yet communication drops frames, the MCU resets, ADC readings jump. If the acceptance criterion says only "function normal", none of that gets recorded - it needs monitored quantities, sampling capability and an acceptance level written together.
One more confusion to clear: 3a/3b are not ESD. ISO 10605 covers discharge from a human hand or a tool, with faster edges, more concentrated energy per event and a low repetition rate; 3a/3b cover switching in the vehicle, with less energy but a high repetition rate. The remedies overlap, the conclusions do not transfer.
4. Acceptance is not "nothing broke" - it is functional status and recovery
| Acceptance item | What to write | What happens if it is missing |
|---|---|---|
| --- | --- | --- |
| Functional status level | One specific level from A to E | The report has observations, not a conclusion |
| Recovery mode | Self-recovering / needs reset / needs power cycle / not recoverable | A non-recoverable result is recorded as recoverable |
| Monitored quantities and sampling | What is monitored, how fast, when recorded | Nanosecond events slip past routine polling |
| Condition record during the test | What is re-checked after each application | Cumulative damage is read as a single-event result |
The functional status column is often reduced to half a sentence. Judging A and judging C are projects of different difficulty; leave the level open and the test cannot be closed out (the A to E levels are covered separately).
The recovery column is frequently dropped. A part that enters protection after a pulse and recovers on its own, versus one that needs the vehicle power cycled, are two very different outcomes for a customer - the first fits inside a functional status grade, the second may be a breakdown call-out on an aftermarket part.
5. Seven columns the outline has to carry
| Column | What to write | Who decides |
|---|---|---|
| --- | --- | --- |
| Applicable version and part | Which revision, which part, whether a company standard is layered on top | Customer technical agreement |
| Pulse list | Which pulses, and why the others are excluded | Customer plus functional level analysis |
| Open-circuit voltage and source impedance | Both, not the voltage alone | Standard clause or agreement |
| Application point and harness | Which end, harness length and routing | Confirmed by both sides |
| Operating mode | Sleep / standby / awake / full load, listed one by one | Customer defines the states |
| Repetition and intervals | Single or repeated, polarity combinations, cooling intervals | Standard or agreement |
| Acceptance and monitoring | Functional status level, monitored quantities, recording method | Customer and technical agreement |
Of these seven, the laboratory can decide on its own only the execution details of how the pulse is applied. The other six come either from the standard text or from the customer technical agreement. A report that can be reproduced rests on all seven being written down, not on the equipment model.
The national-standard side has its own seam: the electrical loads part of GB/T 28046 organises its items around the state of the supply system - DC supply voltage, overvoltage, superimposed alternating voltage, starting profile, load dump - while the pulse waveforms themselves are defined in ISO 7637-2. One governs system states, the other governs transient events along the wiring, so the outline has to state which document supplies each condition rather than choosing one of them (the three basic electrical load items). German projects layer LV 124 on top, where pulse shape and count follow the company standard, not the national one.
The 12 V and 24 V condition sets differ throughout the pulse family as well; the difference between the two systems covers the same trap, and how ISO 16750 relates to GB/T 28046 covers version years and the framework itself, including the part structure of ISO 16750.
6. A few plain words
If someone hands you a report and says the part "passed 7637", ask four questions: which pulses were applied, what source impedance was set, what state the part was in, and which acceptance level was used. If all four have answers, the report is usable. If not, it proves the equipment was working that day.
Do not decide whether pulse 1 or 2b is harder by looking at the numbering. Look at the input stage, at how sensitive the downstream is to undervoltage, and at the thermal margin. Swap one DC-DC on the same platform and the answer can change.
When TMC LAB takes on this kind of commission, the pulse list and source impedance go on the front page of the outline, together with the pulses that were left out and the reason - not for the archive, but because the next person who asks why this part only ran three pulses needs the answer to be on paper.
The split between BCI and radiated immunity follows the same logic: establish which path is under test before discussing margin. Lighting parts have their own note on the transient path (transient immunity of LED drivers), which describes what happens when this same pulse family reaches a constant-current loop. The service entry point is EMC testing.
Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.