Key takeaways
A power module is a package rather than a single device - die, bond wires, die attach, substrate and baseplate are stacked together. Power cycling loads the connections near the die, temperature cycling loads the large-area joint between substrate and baseplate, and neither report substitutes for the other. Degradation shows up first in electrical and thermal readings, with functional failure arriving at the end, so the criterion can only be a drift measured at identical current, identical junction temperature and the same point against the initial value, with the threshold set by the technical agreement. Readings taken at the module terminals average the parallel die, so the first one to degrade is averaged away.
A power module in a motor controller usually fails at the end of the chain, not at the start. One module is not one device: several die are paralleled on a single substrate, separated by bond wires, die attach, substrate and baseplate. Once those layers degrade the vehicle still drives and the report still says the function is normal; only electrical and thermal readings taken at identical conditions against the initial value show it. By the time over-temperature protection trips, output is derated or the device is destroyed, the chain is already at its far end.
1. Four joints, not one device
The die itself rarely fails first. What fails first is the material that connects it outwards.
| Joint | What it connects | Main stress source | How it degrades | Visible at the terminals? |
|---|---|---|---|---|
| --- | --- | --- | --- | --- |
| Die metallisation and bond wires | Die surface to terminal | Thermal expansion mismatch between aluminium and silicon, repeated temperature | Cracks and lift-off at the wire root | On-state voltage drifts up, function unchanged |
| Die attach | Die to substrate copper | The die's own junction swing | Voids grow, delamination | Thermal resistance rises, function unchanged |
| Substrate to baseplate | Ceramic substrate to baseplate | Case and baseplate temperature swing | Large-area delamination, ceramic micro-cracks | Thermal resistance steps, insulation drops |
| Baseplate to heatsink | Baseplate to cold plate | Clamping force and repeated temperature | Thermal interface material pumps out and dries | System thermal resistance creeps up |
The four layers are driven by different stresses, and that is exactly why this family of tests goes wrong: test one layer with another layer's conditions and the result says nothing.
Take the bonds first. Aluminium and silicon differ in thermal expansion by an order of magnitude, so any temperature change concentrates stress at the wire root. A micro-crack appears first, then the whole loop lifts, with the path still connected through a smaller contact area.
Then the die attach. Solder creeps and coarsens when held near its melting range, and voids grow from the ones left by the process. Silver sintering resists this far better, but the stress is pushed elsewhere - the failure location moves, from the attach to the die metallisation and the bond wires. Changing the joining material is not a small durability gain; it relocates the criterion.
2. Power cycling and temperature cycling load different layers
| Condition | Where the temperature swings | Layer mainly loaded | Reading to watch |
|---|---|---|---|
| --- | --- | --- | --- |
| Power cycling | Junction swing large, case swing small | Bond wires and die attach | On-state voltage, junction-to-case thermal resistance |
| Temperature cycling | Case and baseplate swing, die barely self-heats | Large-area joint between substrate and baseplate | Thermal resistance, ultrasonic scan |
| Thermal shock | Same, with faster transfer | Same, with rate-dependent interface stress | Same |
| High-temperature operating and storage | Steady, powered or unpowered | Package materials | Function and parameters |
The judgement here is a single sentence: a number of cycles between a low and a high temperature says nothing about the junction swing.
The chamber moves case and baseplate temperature and loads the outer joints of the package. How hard the bond wires and the die attach are hit depends on the die's own junction swing, which is set by conduction and switching loss, conduction time and cooling. Both are called temperature cycling, yet they are two different tests. To describe power cycling, load current, conduction time, duty cycle and cooling condition must be written down, otherwise nobody reproduces the same junction swing.
The difference between the two profiles is covered separately (temperature cycling is not thermal shock), and how the condition tiers are set is in thermal shock conditions.
3. The criterion can only be a drift
| Reading | What it reflects | Why identical conditions and an initial value are mandatory | Who sets the threshold |
|---|---|---|---|
| --- | --- | --- | --- |
| On-state voltage or on-resistance | State of bond wires and die metallisation | It has a temperature coefficient and follows current and junction temperature | Customer technical agreement |
| Junction-to-case thermal resistance | Voids and delamination in the die attach | Depends on method (transient or steady state) and on the fixture | Customer technical agreement |
| Body-diode forward voltage | The same layer through another entry point | Also follows temperature and current | Customer technical agreement |
| Insulation resistance and withstand voltage | Substrate, ceramic and encapsulation | Affected by humidity, contamination and test voltage | Standard and agreement |
On-state voltage on its own means almost nothing. It has a clear temperature coefficient, so at the same current a warmer junction reads higher; die from different lots and different measurement currents are not comparable. The criterion is therefore not a limit value but a drift from the initial value at the same current, the same junction temperature and the same point.
Thermal resistance is the same story. A transient curve separates the contribution of each layer, a steady-state figure gives one total; change the fixture or the interface material and the total moves. The criterion has to state which method was used, otherwise two thermal resistance numbers compared across reports compare fixtures.
On the threshold column, the standard gives the method and the conditions, not your drift limit. That belongs in the technical agreement, and "drift beyond the agreed value counts as degradation" is far more useful than "function normal, passed".
Whether test hours can be converted into service life depends on the assumptions behind an acceleration model (why hours do not extrapolate into years), and this family deserves a careful look: what is accelerated is the junction swing, not the chamber temperature.
4. Measuring the terminals measures an average
| Method | What it shows | What it hides |
|---|---|---|
| --- | --- | --- |
| Reading at the module terminals | The equivalent of all paralleled die | The one that degraded first |
| Group-wise gate drive | The equivalent of each group | Individual die within a group |
| Probe on each die after opening | Single die | Requires destroying the sample or a dedicated fixture |
| Infrared or camera after opening | Hot spot distribution | Not possible without opening |
| Transient thermal structure function | Layer-by-layer contribution | Needs known loss and a good fixture |
Paralleled die self-balance through the positive temperature coefficient of on-state voltage: whichever runs hotter reads slightly higher and takes slightly less current. Once a bond lifts, that die's equivalent resistance rises, it takes less current, and the others make up the difference - their junctions run hotter, and degradation from then on takes a faster path.
At the terminals this produces a misleading picture: the overall reading moves a little, still looks in range, while a local hot spot on one die is already heading for the protection point. That is what "the terminals cannot see the first one to fail" actually means.
Set this next to the thermal problem in domain controllers: there the question was whether the heat source sits inside or outside, changing how chamber temperature relates to junction temperature. Here the heat source is on the die itself, and there is a group of them, so the reading has to reach the individual die.
5. Five columns in the outline
| Column | What to write | Who decides |
|---|---|---|
| --- | --- | --- |
| Product form | Module or discrete, die material, number of parallel die, permission to open | Customer |
| Cycling type and swing basis | Power or temperature cycling, how the junction swing is measured and controlled | Standard method and customer agreement |
| Criterion and threshold | Definition of the drift, the measurement point, the acceptance tier, per-die or terminal | Customer technical agreement |
| Monitoring and sampling | In-line readings, thermal resistance checkpoints, ultrasonic scan sampling | Confirmed by both sides |
| Post-failure handling | Who opens the package, whether cross-sectioning is done, sample ownership | Customer and laboratory |
The laboratory decides only the execution details. The other four columns come from the standard text or from the customer agreement. The value of a report in this family rests on whether "drift against what, measured under which conditions" is written down, not on the equipment model.
For the part structure and environmental conditions see ISO 16750 and the mapping to GB/T 28046; German projects layer LV 124 on top. The entry point for this side of the work is materials and failure analysis, with service pages for temperature cycling and vibration. On the high-voltage side the module picks up an additional family of electrical load behaviour (electrical loads on the high-voltage side).
6. A few plain words
Before sending samples, answer three questions: with which reading would you see that this module has degraded, are you measuring the die or the terminals, and is your cycle swinging the junction or the chamber? If all three have answers the outline can be written straight away. If not, run one round of baseline measurement first - otherwise what comes back is a report saying the function is normal, and that report proves nothing.
When TMC LAB takes on this kind of commission, the baseline readings and the criterion go on the front of the outline: how the initial value is taken, how the same conditions are reproduced, how much drift counts as degradation, and who opens the package. Leave those four open and the cycling can run as long as it likes - it still yields a temperature curve with no reference.
Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.