Key takeaways
The slow ramp of the supply and the reset behaviour are two separate tests - the first checks whether function stays continuous throughout, the second checks at which voltage the part resets and whether it recovers by itself. The threshold comes from the product design, not from a limit in the standard, and because of hysteresis, confirmation delay, load and line loss, and thermal drift it is two numbers rather than one. The acceptance criterion has to pick one of three tiers and map it onto a functional status level, while monitoring must state the measurement point, the sampling capability, the reset flags and the starting instant of the recovery time. Measuring at the chamber terminals instead of the part, mistaking inrush current for a reset, and losing the monitoring link after the reset are the three usual ways this test goes wrong.
A report line saying "reset voltage 8 V, function recovered, passed" supports almost no decision. Undervoltage protection is built with hysteresis, so the threshold it falls through and the threshold it climbs back over are not the same number. More to the point, the slow decrease and increase of the supply and the reset behaviour are two separate tests in the standard - one checks whether function stays continuous throughout, the other checks how the part comes back after a reset. Squeeze both into one line and two reports can no longer be compared.
1. Two tests, not one
Scope first: both sit in the electrical loads part and both look at behaviour at the steady-state edge of the supply, not at transient events. Load dump and momentary drop are judged by energy and immunity, with pulse shapes and repetition set in the transient documents.
| Test item | What is applied | What is observed | Who sets the criterion |
|---|---|---|---|
| --- | --- | --- | --- |
| Slow decrease and increase of supply voltage | Sweep from one end of the operating range to the other at a defined rate, then back | Whether function stays continuous throughout, and whether resets, false actuation or loss of communication occur | The standard gives the endpoints and the rate; which effects are acceptable comes from the functional status level and the customer agreement |
| Reset behaviour | Step down and up through a set of voltage points at a defined rate, one point at a time | At which voltage the part acts, whether it recovers by itself, how long recovery takes | The customer technical agreement (the standard does not set your threshold) |
The table reduces to one sentence: the standard defines how the stress is applied, not at how many volts your part resets.
The threshold comes from the design - the detection point of a reset IC, the brown-out setting of the MCU, the input undervoltage lockout of a DC-DC converter. The designer chose it. So what the laboratory actually measures is where the design value you wrote down falls, not whether you met some limit.
For orientation on the neighbourhood: the three basic electrical load items cover DC supply voltage, overvoltage and superimposed alternating voltage. The two tests here sit in the same part but ask a different question - not whether the part can withstand it, but where it considers the supply to have fallen away.
2. The threshold is two numbers by construction
| Factor | Mechanism | How to pin it down in the outline |
|---|---|---|
| --- | --- | --- |
| Hysteresis | The comparator needs a return band, so the falling threshold sits below the rising one | Run both directions and record them separately |
| Confirmation delay | The undervoltage must persist briefly before the reset is asserted | State the sampling rate and what counts as a reset |
| Load and line loss | The voltage at the part is lower than at the chamber terminals, and the drop scales with current | State the measurement point and the load state |
| Temperature | Reference and detection point drift | State the ambient temperature during the test |
Hysteresis. A comparator needs a return band near the threshold, otherwise a single ripple at the edge triggers a reset. The falling threshold is low, the rising threshold is high, and the band between them is the hysteresis.
Confirmation delay. Reset ICs and MCU detectors usually require the undervoltage to persist for a short time. Voltage reaching the threshold and the reset actually being asserted are separated by that delay.
Load and line loss. The voltage read at the chamber terminals is the terminal voltage; the part sees it minus the drops across harness, fuse and connectors, and those drops follow the current. A no-load run and a full-load run do not reset at the same point.
Temperature. References and detection points drift, so a cold part and a warm part do not agree.
Stack the four together and there is one conclusion: a single number cannot be reproduced and cannot be turned into a margin statement; two directions plus the test conditions can.
3. Three acceptance tiers, four things to monitor
A reset is not a failure by itself. What matters is whether the part comes back on its own and whether its state is correct afterwards. So the criterion splits into three tiers.
| Tier | What is allowed | Typical use |
|---|---|---|
| --- | --- | --- |
| No reset permitted | Function continuous throughout; only parameters may shift within the specified range | Safety-related outputs and functions that must not be interrupted while driving |
| Reset permitted, self-recovery required | A reset may occur; the state after recovery is verifiable and no external action is needed | Comfort, display and non-real-time communication functions |
| Reset permitted, external action required | Power must be cycled or an operator must intervene | Aftermarket parts and auxiliary functions outside driving conditions |
Which functional status level from A to E each tier maps onto is set by the customer agreement. Leave the tier open and the test cannot be closed out (the A to E levels are covered separately).
| Monitored item | Why it has to be written down |
|---|---|
| --- | --- |
| Measurement point | Chamber terminals or part terminals - line loss sits between them and the conclusion can shift a tier |
| Sampling capability | The excursions last milliseconds; routine polling misses them |
| Reset flags | Software reset counters, power-fail flags and reset-cause registers are the evidence of how many resets actually occurred |
| Starting instant of recovery time | From the voltage returning to the lower limit, from function recovering, or from communication recovering - the three differ by a large factor |
The reset-flag row is the one usually dropped. The part did reset, but the supply curve only looks like a brief dip; without the software flags the report can say the voltage fluctuated, not that the part reset twice.
4. Six columns in the outline
| Column | What to write | Who decides |
|---|---|---|
| --- | --- | --- |
| Applicable version and part | Which revision, which part, whether a company standard is layered on top | Customer technical agreement |
| Endpoint voltages and ramp rate | From which voltage to which, at what rate | Standard clause or agreement |
| Dwell time and repetition | How long at each voltage point, how many rounds | Standard or agreement |
| Load state | No load / rated / peak, and which outputs are loaded | Customer defines the states |
| Criterion and allowed effects | Which of the three tiers, mapped to which functional status level | Customer |
| Measurement and monitoring | Where, how fast, which flags recorded | Confirmed by both sides |
The laboratory can decide on its own only the execution details. The other five columns come either from the standard text or from the customer agreement. A report that can be reproduced rests on all six being written down, not on the equipment model.
5. Where it usually goes wrong
Measuring the chamber terminals and not the part. Line loss makes the voltage at the part lower than the recorded value, so the part resets "early" while the numbers in the report do not line up. When the customer cannot reproduce it elsewhere with the same part, the first suspicion falls on part consistency.
Mistaking inrush for a reset. A large capacitive load draws heavy inrush during the rising ramp, trips overcurrent protection, and the output shuts down and restarts, which looks exactly like a reset. The difference is the flag: a real reset has a reset cause, a protection trip does not.
Losing the monitoring link after the reset. The part resets, communication drops, the host log stops - and no record becomes no event. The monitoring chain itself needs a link-loss flag.
The first round and the last round disagree. Electrolytic capacitors, references and detection points drift with cycles and temperature; concluding after one round tends to land on the pre-drift reading.
Mixing it up with transients. Load dump and momentary drop are judged by energy and immunity (load dump 5a versus 5b), while the slow ramp is about continuity at the steady-state edge. The remedies are unrelated: one moves clamping and heat, the other moves thresholds and hysteresis width. High-voltage parts add a family of their own action on top (electrical loads on the high-voltage side).
6. A few plain words
Before sending samples, answer three questions: at how many volts does the part reset, is the falling number the same as the rising one, and how long does it take to come back by itself? If all three have answers, the outline can be written straight away. If not, run one self-test first - otherwise what comes back is a voltage curve, not a conclusion.
When TMC LAB takes on this kind of commission, the measurement point (chamber terminals or part terminals) and the way the reset flags are read go on the front page of the outline, together with two decisions from the customer: which tier the criterion sits in, and from which instant the recovery time is counted. Without those, a beautiful curve still cannot be closed out.
The 12 V and 24 V condition sets differ in this family as well (the difference between the two systems), and how ISO 16750 relates to GB/T 28046 covers the part-by-part mapping. To work through the clauses, see the electrical loads part of GB/T 28046 and the breakdown of ISO 16750-2; ISO 16750 holds the part structure, and German projects layer LV 124 conditions on top. The service entry point is EMC testing.
Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.