TMC LAB testing laboratory
Industry Watch 0

Moving the Same Line to a New Plant - Five Quantities That Decide Which Tests Must Be Re-run

The hard question after a plant move is not whether to retest, it is how you justify calling it the same process. Drawings, BOM and process parameters may be untouched while the existing report no longer holds, because what made it valid was the controlled variation on that shop floor. Relocation, duplicated lines, split production and outsourced operations change different things, so the re-run scope should not be one template.

TMC LAB testing laboratory
Industry Watch 1

Replacing an Automotive Chip with a Domestic Part - Which Tests Must Be Repeated, and Which Reports Still Hold

Whether a chip swap requires new testing is not decided by where the part is made, but by which layer the change lands on. Device-level qualification, part-level environmental and EMC testing, and approval or quality-system evidence are three separate ledgers. Blur them and you end up concluding that pin-to-pin compatibility means no retest is needed. Pin compatibility guarantees one thing only: the part fits.

TMC LAB testing laboratory
EMC 3

Transient Immunity of Automotive LED Drivers - When the Current Loop Amplifies the Pulse First

Transient immunity for automotive lighting is not simply running pulses down the supply line. An LED driver is a closed-loop constant-current source, so a short input pulse is read as a brightness error and corrected, while switching ripple and harness resonance stack on the output side. This article separates the three amplification stages, explains why the acceptance criterion has to be written on light output, and lists the four columns the test outline must pin down.

TMC LAB testing laboratory
Industry Watch 2

How VW 80101 Relates to ISO 16750 - Not a German Edition, Not a Stricter Edition

VW 80101 is not a German edition of ISO 16750, and the two do not map part by part. What actually decides the test in a project is the controlled version named in the customer technical file plus the drawing reference. This article sets out the three document layers, why conditions cannot be converted one to one, and how the basis column of a report has to be written.

TMC LAB testing laboratory
Industry Watch 5

What an 800 V Platform Changes in Component Testing - Withstand Voltage Is Not a Multiplication

An 800 V platform does not just change one voltage number. It changes four condition dimensions - how the insulation criterion is defined, which EMC band degrades first, why halved current does not halve heat, and how irreversible high-voltage failures must be judged. This article lists the four columns a test plan has to rewrite.

TMC LAB testing laboratory
Standards Explained 2

Temperature Cycling and Thermal Shock Are Not a Fast-and-Slow Pair - Two Profiles, Two Failure Families and Four Columns Every Automotive Test Outline Needs

Treating temperature cycling and thermal shock as a fast and a slow version of the same test is a costly misjudgement in climate commissions. The temperature change method, chamber arrangement and in-situ monitoring options all differ, and so do the failure mechanisms each one exposes: one accumulates thermal fatigue over repeated cycles, the other opens interfaces under an instantaneous gradient. This article removes three common misreadings and sets out the profile differences, the failure mapping and four columns that belong in every test outline.

TMC LAB testing laboratory
Industry Watch 2

Testing NEV Components Is Not a Copy of the 12 V Standard - Three Document Layers and Three Extra Verdicts for High-Voltage Parts

Copying the environmental and electrical-load clauses written for 12 V parts onto high-voltage components is a frequent and expensive misjudgement in NEV projects. Three document layers each cover a different span, and what high-voltage parts add is not simply a higher voltage but insulation and withstand testing, the timing of safety actions, and transients set by precharge and contactor switching. This article sets out the division of labour, four real differences and four items to align before samples are submitted.

TMC LAB testing laboratory
Standards Explained 2

24 V Is Not 12 V Doubled - Where ISO 16750-2 Electrical Load Conditions Actually Diverge

Electrical load conditions for 12 V passenger cars and 24 V commercial vehicles are not scaled versions of each other. The operating voltage window, the cranking waveform and the load-dump clamping path all diverge, and 24 V adds four problems of its own: series-battery imbalance, dual-voltage switching transients, reverse polarity and ground offset. This article covers where the differences land and how to fill the four columns of the test outline.

TMC LAB testing laboratory
Standards Explained 0

AEC-Q vs ISO 16750: component qualification and assembly-level validation are two different jobs

AEC-Q tests the component itself; ISO 16750 tests the environment once it is fitted to the vehicle. A part that passes AEC-Q does not mean the assembly will pass 16750.

Choosing the severity level for ISO 16750-3 vibration and shock testing
Standards Explained 3

Choosing the severity level for ISO 16750-3 vibration and shock testing

The wrong severity either over-tests and wastes money, or under-tests and never exposes the real risk. The key is to establish the mounting position and the vehicle duty cycle.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.