Key takeaways
800 V is a bus voltage class, not a test condition. Four columns in the plan must be rewritten - voltage domain and maximum working voltage at the terminal, the insulation criterion including where the test voltage comes from and how failure is judged, current-and-temperature-rise measured together, and monitoring points plus safety action timing during the stress. Start without them and rework is likely.
Almost every enquiry about 800 V parts opens with the same question: can we just double the test voltage? No. Raising the bus voltage changes four condition dimensions, not one number - how the insulation criterion is defined, which EMC band degrades first, the fact that current halves at equal power while heat does not, and the way high-voltage failures must be judged because they cannot be reversed. Leave those four out of the plan and you have a 12 V template with a new voltage written on it.
1. Separate the platform voltage from the voltage at the terminal
800 V is a vehicle bus level. On the same vehicle, a component may sit on the 800 V bus, on a 400 V step-down rail, or on a 12 V or 48 V low-voltage rail.
So the opening column of the test plan should not read "vehicle nominal 800 V". It should answer three things: which rail the supply terminal connects to, what the maximum working voltage of that rail is, and where transients come from.
Get that column wrong and every condition after it is wrong as well.
Two voltage domains on one vehicle have a knock-on effect. Switching on the high-voltage side couples into the low-voltage side along the common-mode path, so the immunity conditions for a low-voltage part cannot be written from the low-voltage rail alone. The switching state of the high-voltage side belongs in the list of operating conditions.
Under one busbar architecture, parts tapped at different points do not see the same stress at all. How to split voltage domains and read a busbar structure is covered in this article.
2. Withstand voltage is not the test voltage multiplied
A dielectric withstand test checks whether the insulation structure holds. It does not check whether the function works. These two have completely different criteria, and reports mix them up regularly.
The test voltage follows from the maximum working voltage, the overvoltage category, the pollution degree and the material group (insulation coordination is described in the IEC 60664 series), plus any tightening in the OEM standard and the technical agreement. It is not the platform voltage multiplied by a factor.
| Condition item | What the plan must state | Frequent mistake |
|---|---|---|
| --- | --- | --- |
| Voltage domain | Rail at the terminal, working voltage ceiling, transient source | Filling in the vehicle nominal voltage |
| Source of test voltage | Which clause, which OEM standard, any tightening agreed | A bare number with no source |
| Application and criteria | Ramp rate, dwell, judged as breakdown or as leakage current | None of the three, report says "no abnormality observed" |
| DC-specific checks | Partial discharge, insulation resistance and its measurement point | AC withstand only, DC state untested |
Direct current behaves differently from alternating current here: there is no zero crossing, so an arc does not readily extinguish. The question is therefore not whether a spark appeared but whether a sustained discharge existed. Without that in the plan, the call is made on site by experience, and a third party will struggle to accept the conclusion.
Partial discharge under DC deserves its own slot, because it signals a defect inside the insulation rather than a flashover on the surface. The sequence and the division of labour between the three methods is covered in the partial discharge article.
3. Higher switching frequency moves which band fails first
800 V platforms generally use wide-bandgap devices. Two consequences follow directly: switching frequency goes up, and voltage slew rate goes up.
What those two change is where you expect trouble in EMC. The conducted emission band of interest moves higher, near-field coupling gets stronger, and filter parasitics - equivalent series inductance and resistance - start to dominate the result.
The standards themselves have not changed. The band split and detector types on the CISPR 25 page are unchanged, the application method on the ISO 11452 page is unchanged. What changes is which band to watch first. The split between conducted and radiated work is set out on the EMC page.
| Location | Change at 800 V | Reason |
|---|---|---|
| --- | --- | --- |
| Conducted emission, low band | Relatively small | Main switching energy moves up, so the low band carries less |
| Conducted emission, high band | Shows up earlier | Higher slew rate extends the harmonic envelope upward |
| Radiated emission | Harness and shield become the main radiator | Loop area drives radiation efficiency, not voltage class |
| Radiated immunity | Housing seams and interlock loop react first | The interlock is a low-level signal routed through a strong field |
Do not treat Class as a voltage grade. Class 1 to 5 in CISPR 25 are limit classes assigned by mounting location, with no conversion to platform voltage. The selection logic is explained in this article.
One more item tends to get split between two departments: how the shield of a high-voltage harness is bonded at both ends. That bonding sets the size of the common-mode loop, and it is a safety question and an EMC question at the same time. Writing it into only one document leaves a gap.
4. Current halves at equal power, heat does not follow
Power equals voltage times current. At the same power, an 800 V system draws roughly half the current of a 400 V system, and copper loss falls with the square of current. The step that people take next - "so the heat halves too" - is where the error starts.
Three places where heat does not follow:
- Switching loss rises with switching frequency, and that is exactly what moved up;
- Contact resistance in busbars, terminals and connectors does not shrink because the voltage is higher, so contact points stay the hot spots;
- High-voltage connectors are volume-constrained, so their heat-dissipating area did not grow with the current.
Temperature rise therefore has to be measured together with current carrying, and measured again before and after the environmental sequence. Contact resistance climbs with temperature and temperature climbs with contact resistance; on high-voltage parts that feedback is stronger, and a single reading tends to look optimistic.
Sealing and ingress protection have to follow the same logic. The IP rating of a high-voltage connector should be rechecked after thermal cycling and vibration, and only a reading in the assembled state counts. Relevant test practice is on the ingress protection page and the environmental and material page.
5. High-voltage failures are irreversible, so judge during the stress
Most 12 V failures are recoverable functional anomalies - a reset, a drifted parameter, a flickering display - and they can still be investigated after the test. Dielectric breakdown, arcing and thermal runaway on the high-voltage side are not that kind. One event and the sample is gone.
The conclusion is blunt: criteria for high-voltage parts must be evaluated while the stress is applied, including whether the safety action sequence - disconnection, opening, current limiting - actually happened as specified.
A timestamp matters more than a verdict. A report saying "protection acted correctly" with no time reference is not evidence.
Functional status grading cannot stop at "function normal after the test". On high-voltage parts, the A to E grade has to be tied to specific observable behaviours, or that column will be sent back in review.
How the standard layers divide the work - basic layer, product layer, market access layer - is covered in this article, and how to trim the test list by mounting location in this checklist method.
A few plain words
The term "800 V" settles far less in a test plan than people expect. It states a bus class, and four things still have to be decided one by one:
- Voltage domain and maximum working voltage, down to the terminal;
- The insulation criterion: where the test voltage comes from and which clause decides failure;
- Current and temperature rise measured together, with readings before and after the environmental sequence;
- Monitoring points and sampling: which quantities, how fast, what counts as abnormal.
When TMC LAB takes on a high-voltage component programme, these four columns are confirmed together with the sample list before any condition level is discussed. Plans that start with the columns empty tend to come back for rework.
Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.