Skip to main content
  1. Home
  2. Technical Blog
  3. Failure Analysis
  4. All Tests Passed Yet It Fails in the Vehicle - Four Gaps and a Falsify-First Review Order

All Tests Passed Yet It Fails in the Vehicle - Four Gaps and a Falsify-First Review Order

Key takeaways

Most in-vehicle failures are not caused by limits that are too loose but by four things in the test that are not isomorphic with the vehicle - sample, boundary, stress profile and criteria. The review order is to first falsify whether the report can be extrapolated, then decide whether the failure sits in a coupling the test cannot reach, and only then discuss tightening - and each tightened item must point to a specific failure chain.

A sentence that comes up often during enquiries is "we have already run all the tests". Here is the conclusion first: a pass on a report certifies exactly one thing - this sample, under this boundary condition, against this criterion, is acceptable. Most in-vehicle failures are not caused by limits that are too loose. They are caused by four things - sample, boundary, stress profile and criteria - not being the same thing as the vehicle duty state. So the first move in a review should not be tightening. It should be falsification.

1. Unpack the word "pass"

A report saying "pass" answers at least three questions: what passed, in what state, against which criterion.

What passed. Engineering samples are often hand-assembled and submitted one at a time. Series parts differ in supplier spread, secondary processing and batch variation. The report is responsible for the part that arrived at the laboratory, and that sentence tends to be forgotten once a dispute starts.

In what state. Powered or unpowered, rated load or no load, component alone or with the vehicle harness, running mode or standby. This usually occupies a single line in the report, yet it decides how much weight the conclusion carries.

Against which criterion. Functional status classes A to E in GB/T 28046.1 judge whether the device still performs its function, which is an engineering-oriented view. Customer acceptance criteria are often finer, reaching audible noise, picture quality, touch response and parameter drift. Different criteria let the same data set yield two conclusions. For how the five classes are judged, see the dedicated article.

DimensionWhat the report usually statesWhat the vehicle actually cares about
---------
ObjectBatch and state of the submitted sampleSeries parts, including supplier and process spread
StateOne operating mode, one load connectionAll operating modes and the transitions between them
CriterionStandard clause plus functional status classClause plus customer acceptance criteria plus user-perceived behaviour

Only when all three rows are written down can a report be called extrapolable. Miss one row and the conclusion stops inside that report.

2. Four gaps where failures originate

The distance between a test and a vehicle falls into four places. They do not all have to go wrong. One is enough to turn "passed" and "usable in the vehicle" into two different things.

GapWhat the test usually doesWhat the vehicle actually is
---------
SampleEngineering sample, single unit, hand assemblySeries part, batch and secondary-process variation
BoundaryRigid fixture, simplified mounting points, no neighbouring partsFlexible bracket, shared rack, shared ground and harness
Stress profileSingle stress, accelerated level, compressed timeSuperimposed stresses, long duration at low level, random order
Criteria and monitoringSpot checks at nodes, post-test functional checkUsable throughout, user-perceivable behaviour

The boundary row deserves a note. A vibration fixture is usually stiffer than the vehicle bracket, so what gets measured is a structure that has not yet been softened. With a flexible bracket, neighbouring parts on the same rack and the real harness attached, both the resonance position and the amplification change. For mounting and axis effects see the vibration testing page, and for choosing between sine sweep and random see that selection article.

The stress-profile row hinges on the premise of acceleration. Acceleration trades a higher level for shorter time, and the premise is that the failure mechanism does not change. Once the mechanism changes, acceleration becomes a different test and the time read out can no longer be converted back.

The criteria row hides a trap in monitoring. The vehicle demands continuous operation, while the test often samples only at key nodes and records nothing in between. Without defined monitoring items, all that remains afterwards is the sentence "function was normal after the test".

3. Three couplings a component test cannot reach

This is where most of the information sits in a vehicle-failure review. The boundary of a component test is one part, while a vehicle failure usually happens between parts, or between stresses.

CouplingWhy a component test cannot reach itHow to approximate it in a test
---------
System-level common modeSingle-unit testing; the superposition of shared ground and shared harness does not existRun system integration as a separate item, with the real harness and bonding
Stress superposition and orderA single-stress test activates one mechanism and flattens the sequenceFix the order in a combined profile, see the combined test article
Assembly preload and toleranceSamples are simplified: harness laid straight, connectors free, no torqueAssemble to vehicle torque, routing and seal compression, then test

System-level common mode applies to both emission and immunity. Every unit passes alone, but when several operate together, emissions add and immunity paths couple, and the problem only appears at system level. The corresponding items are listed on the EMC capability page, with one caveat: a component report cannot answer a system question. That is not a defective report, it is a question the report was never asked.

Stress superposition and order is subtler. As temperature rises, materials soften and preload shifts, so the same vibration level produces a larger response. Alternatively, a thermal cycle opens a micro-crack that only propagates once vibration follows. Such a failure is split across two catalogue items, and neither is exceeded on paper.

Assembly preload is the most underestimated of the three. Harness slack, connector angle, seal compression and fastening torque are often done whichever way is convenient on a sample. Preload that a sample lacks will certainly exist in the vehicle.

4. Review order: falsify first, tighten later

After an in-vehicle failure it is tempting to jump straight to retesting against a stricter OEM standard. The order is wrong because it skips the question of which category the failure belongs to.

Four steps, each backed by checkable evidence rather than impression.

StepQuestion to answerWhere the evidence comes from
---------
OneIs the report valid, and how far can it be extrapolatedItem name and standard revision, sample batch, boundary records, criterion text
TwoAre the test conditions isomorphic with the vehicleFixturing, harness, load, supply voltage domain, operating state, item by item
ThreeDoes the failure sit in a coupling the test cannot reachWhether location and morphology fit common mode, order, or preload
FourWhich item to tighten, and which failure chain it coversEach tightened item mapped to a mechanism, written into a supplementary plan

Step three is the watershed. If the failure morphology is explained by system-level common mode, what needs changing is harness routing, bonding and ground structure; raising the vibration level will not fix it. If it is micro-crack propagation, what needs adding is stress order, not a single-item level. If step four cannot answer which chain the tightened item covers, the only real effect of tightening is a longer test.

For how to trim a project list by mounting location and group it by failure chain, the environmental reliability checklist article gives the method. Conditions and levels should be taken from the current revisions of GB/T 28046 and ISO 16750; do not map the two series from memory.

5. Four things to settle before submitting samples

A review is reactive. The four items below are proactive, all settled before testing starts and impossible to change afterwards.

First, write the boundary into the plan: fixturing and mounting points, harness length and routing, load connection, operating state, supply voltage domain. If these five are unclear, the resulting report cannot be judged for extrapolation.

Second, separate component and system. A component report must not stand in for a system integration conclusion; test system-level questions at system level instead of explaining them away with a single-unit report.

Third, define monitoring items in advance: which quantities, what sampling, what counts as abnormal, who decides. Leave this blank and no data can be recovered later.

Fourth, agree on post-failure handling: evidence-preservation order, reproduction conditions, and the sequence from non-destructive to destructive examination. What to do when a sample fails during testing covers that order in detail and is worth writing into the contract stage.

A few honest words

Most vehicle-failure reviews end at step three, because the problem was never in the test. It was in the boundary that nobody wrote down.

Doing three things in order beats adding one more test item: establish whether the conclusion can be extrapolated, establish which gap it differs at, and only then discuss what to add. Reverse the order and you are performing tightening while solving a different problem.

When TMC LAB takes on this kind of review, the first step is to compare the submitted sample state against the vehicle boundary item by item, and only then decide whether supplementary testing is needed and which item it should cover. Conditions and criteria follow the standard text and the customer technical agreement; no values are preset at the planning stage.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

The report says it passed, yet it fails once installed. Is the laboratory report at fault?
First define what a pass covers. The report is responsible for that sample, that boundary condition and that criterion, not for the vehicle state. To judge validity, check three things: whether the tested sample's batch and process match series production, whether fixturing, harness, load and supply are isomorphic with the vehicle, and whether the criteria cover what the vehicle actually cares about. If any one of the three differs, the report is still a valid conclusion, it simply cannot be extrapolated. What needs review is whether the boundary ever got written into the plan, not who to blame.
Should we simply retest against a stricter OEM standard when a vehicle failure appears?
Tightening only helps if it points at a specific failure mechanism, otherwise it just makes the test longer. Run three falsification steps first: review whether the report is valid and how far it can be extrapolated; review whether the test conditions are isomorphic with the vehicle; and decide whether the failure is explained by system-level common mode, stress superposition in time, or assembly preload. Only then set the tightened items, and each item must map to a failure chain - a common-mode problem is fixed by harness routing, bonding and ground structure, not by raising the vibration level.
What can be done at sample submission to reduce the chance of a lab pass followed by an in-vehicle failure?
Four things can be fixed before the test starts: write fixturing, mounting points, harness length and routing, load connection, operating state and supply voltage domain into the plan; do not let a component report stand in for system integration conclusions, test system-level questions on the system; define monitoring items in advance - which quantities, what sampling, what counts as abnormal; and agree on the evidence-preservation order, reproduction conditions and the sequence from non-destructive to destructive examination. If these four are not fixed, they cannot be changed once testing begins.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826
Call