Skip to main content
  1. Home
  2. Technical Blog
  3. Failure Analysis
  4. A Plausible Cause Is Not a Failure Analysis: Sequence, Dose, Reproduction and Ruling Out the Alternatives

A Plausible Cause Is Not a Failure Analysis: Sequence, Dose, Reproduction and Ruling Out the Alternatives

Key takeaways

Attribution is not finding one chain that makes sense, it is ruling the other chains out one by one. Four tests: sequence (the cause precedes the failure), dose (severity tracks stress or defect level monotonically), reproduction (the same morphology is recreated under the same conditions), and alternatives (other paths are ruled out individually). Three statements look like evidence but only go halfway: same batch means same cause, the single difference must be the cause, and a similar morphology means a similar mechanism. Proximity in time is not causation either. Write the conclusion in three grades - established, highly probable, cannot be excluded - and keep a separate column for the paths already ruled out.

A cause that makes sense is still a long way from a cause that holds. Four tests stand between them: it must precede the failure, the severity must track it, it must be reproducible under the same conditions, and the other possible paths must be ruled out one by one. The usual mistake in failure analysis is not failing to find a cause, it is stopping at the first one that tells a coherent story. Such reports collapse at the second round of questioning, and the questioner is usually the quality engineer at the OEM.

This article is about the attribution layer only: what has to be decided between "the part failed" and "this is why it failed". The mechanisms themselves - where a fracture runs, where a crack starts, how migration grows, how fatigue accumulates - each have their own treatment elsewhere.

1. Four tests: a cause has to pass all of them at once

They are not parallel checkboxes, and their cost differs widely. Sequence and dose can be examined on the part and in the records; reproduction needs equipment and samples; excluding alternatives needs a denial performed on each path in turn. Work from cheap to expensive and most wasted effort disappears. Start with metallography and you often finish the section before the timeline is even clear.

TestWhat it has to proveWhat happens if it fails
---------
SequenceThe cause precedes the failure and falls inside the same time windowThe effect is recorded as the cause, e.g. old damage surfacing after a test is charged to the test
DoseSeverity or failure rate moves monotonically with stress, exposure or defect levelOne failure in a batch leaves the path as a candidate only
ReproductionThe same morphology is recreated under the same conditionsWithout it the report can only say "not observed under these conditions"
AlternativesOther paths that produce the same morphology are ruled out one by oneThe conclusion stays a candidate and fails on the next similar case

Sequence is easy to pass and easy to fake. Damage on a part proves the damage is there, not when it arrived. Teardown records, assembly records and monitoring traces during the test - miss one of the three and the timeline becomes inference. Inference belongs in the report, but labelled as inference rather than mixed into measured results.

Dose has the most resolving power of the four. A path that actually operates will usually show a failure rate that follows increasing stress, longer exposure or a higher defect level. If most parts are fine and only a few fail under identical conditions, the path alone is not sufficient and one more condition has to stack on top of it - and that stacked condition is often the real subject. It also explains why raising severity is not an attribution method: it changes probability, not mechanism.

Reproduction guards against a different overreach. When it cannot be achieved, the report may say the phenomenon was not observed under those conditions; it may not say the sample does not have the problem. The first is an observation, the second a causal claim, and the gap between them is where every later dispute lives. Intermittent faults make this sharper, with their own reproduction sequence (an intermittent fault that will not show up).

Excluding alternatives takes the most work and produces no new conclusion. Its whole job is to subtract wrong ones. The same order applies to methods: stay away from the saw where possible, image first, then decide where to cut (X-ray and CT inspection).

2. Three statements that look like evidence and are only half way

Three sentences recur in every review meeting. All sound like conclusions; all stop half way.

Common statementWhat it actually establishesWhat is still missing
---------
Every part in the batch failedDifferences between batches are excludedWhether failed and non-failed parts went through the same operation on the same machine
Only one supplier changed between the two batchesA known difference existsSwapping that single item back and re-running a comparison group
The fracture looks like the one in another reportThe fracture mode is the sameWhether origin, propagation direction and final fracture zone also match

The word batch is much bigger than it sounds. Parts from one batch share the material lot, the machine, the tooling, the shift and the process settings. Consistency inside a batch therefore only removes differences between batches; landing on incoming material needs one more split.

A single-variable comparison assumes everything else really is identical. Material, line, shift, maintenance history and assembly technique often change together without appearing in the comparison table. If the phenomenon is unchanged after the swap, that item is not the cause. If it changes, it is not automatically the cause either - direction and dose relationship still have to line up. Assembly itself puts stress into the part, which is regularly missed when comparing parts from one batch (assembly stress borrows life before the test).

The same morphology only means the same fracture mode. Intergranular, dimpled, striated - the origin can still be completely different: a notch, hydrogen, or a microcrack present since assembly. Read the positional relationship between origin, propagation direction and final fracture zone rather than the adjectives.

There is a subtler one: proximity in time treated as causation. A crack found after a test, a failure after a few hundred kilometres - being close in time does not make the second the result of the first. The test may simply have pushed existing damage past its limit, with the real starting point several operations earlier. Only the sequence test can separate these; "it was fine before" cannot.

3. Enumerate the alternatives: sweep three paths

Alternatives are not found by inspiration but by sweeping paths. For any automotive electronic part, candidate causes sit on three paths: incoming material and design, manufacturing operations, and use and assembly. Go through them one at a time, each with a low-cost denial.

PathTypical causes on this pathLow-cost denial
---------
Incoming material and designMaterial state, coating, structural margin, tolerance stack-upCheck lot records and drawing margin; measure a baseline on unassembled parts
Manufacturing operationsDepanel, press-fit, tightening, soldering, cleaning, conformal coatingKeep unassembled parts from the same batch; measure before and after the operation
Use and assemblyMounting attitude, harness pull, supply and grounding, environmental exposureInstallation photos, vehicle duty records, a reference part in the same location

Only the paths that survive the sweep belong under possible causes. Anything not covered must be stated as not covered - a blank cell and the words not covered read very differently to the person receiving the report.

Start with manufacturing operations. It sits in the middle, touches incoming material on one side and assembly on the other, and retention samples are easy and cheap. The incoming side needs a step at the batch boundary; the assembly side needs the field. Evidence for both usually lives outside the laboratory, so ask for it early.

The history of the failed part is itself rewritten on those three paths. Packaging, transport and storage replace part of the evidence before the part arrives (the part had already changed when it reached the lab), which is why that segment belongs on the request form as well.

4. How to write the conclusion: separate ruled out from not yet ruled out

The strength of an attribution comes from evidence, not from wording. The same case written in three grades lets a reader see immediately how far the work went.

GradeBasisHow it reads in the report
---------
EstablishedAll four tests passedMechanism chain, start and end locations, comparison results; a judgement can follow
Highly probableSequence and dose passed, reproduction not doneState which test is missing and what completing it requires
Cannot be excludedOnly sequence passedListed as a candidate, in parallel with the others, unranked

Cannot be excluded is not vague, it is accurate. What separates it from suspected or possibly is that it also describes the scope of the sweep: these paths were not excluded, those were. A separate column for paths already ruled out produces no conclusion, but it documents the breadth of the work and saves the next person from repeating it.

Conditions and judgement criteria go at the front, conclusions at the back. GB/T 28046 and ISO 16750 supply applied conditions and functional status grades, not attribution; a standard can say under what conditions a part failed, never why. Draw that line explicitly, or readers will mistake a clause for a cause.

5. A few plain words

Saying clearly what it is not is worth as much as saying what it is, especially when supplier and OEM sit across a table. The first limits the damage; the second only assigns blame.

An attribution abandoned half way usually gets reopened later, at a higher total cost. Four columns on the request form are worth the effort: how the failure is defined, which paths are already excluded, which hypotheses remain, and which grade the conclusion will be written in. When TMC LAB takes on a failure analysis request, those four columns become the outline before any work starts, so the question that matters is not discovered after the measurements are done.

The common failure is not an undiagnosed cause, it is a report that runs ahead of its evidence. Pass however many of the four tests you passed, and write exactly that - it is worth more than a polished conclusion.

Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

Must a failure analysis reach reproduction before it can conclude anything?
Not necessarily, but say which test is missing. Reproduction upgrades an observed association into a repeatable mechanism; it is expensive, slow, and often impossible with limited samples or irreversible failure. The conclusion then drops to highly probable: state that sequence and dose passed, that reproduction was not done because of sample count or irreversibility, and what would be needed to complete it. Writing established when only the sequence test passed is the usual overreach - damage found on a part proves the damage is there, not when or why it arrived.
If every part in one batch fails, does that point to incoming material?
It only removes differences between batches, it does not point to incoming material. Parts from one batch share the material lot, the machine, the tooling, the shift and the process settings, and all of that sits inside the word batch. To land on incoming material you need one more split: compare failed and non-failed parts from the same batch on edge condition, coating and material state. If they match, the incoming path is largely excluded and the process side remains. Evidence that really points to incoming material is usually a step at the batch boundary - a rate that changes between lots - not consistency inside one lot.
Does listing a single probable cause make a report look weak?
The opposite. Listing the paths that were not excluded is the more professional form, because the strength of attribution comes from evidence rather than wording: four tests passed means established, sequence and dose passed without reproduction means highly probable, sequence alone means a candidate with no ranking. Dropping candidates is risky because readers assume the sweep was complete, and when another case with the same morphology shows up the earlier report becomes a liability. Keep a separate column for paths already ruled out: it shows the breadth of the sweep and saves the next person from re-checking the same path.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826
Call