Key takeaways
A fault that cannot be reproduced is not lawless; the conditions simply were not all present. Split it into thermal, mechanical and electrical trigger classes, ask first when the fault does not occur, then stack two real variables in the same window and monitor while stressing. Severity alone raises probability, it does not change the mechanism.
An intermittent fault is not a random fault. It needs three conditions present at the same time: temperature, mechanical stress and electrical state. Remove one and it disappears. So "we could not reproduce it on the bench" does not mean the sample is good - it means at least one of those three was left outside the laboratory door.
That is exactly where intermittent failures get misjudged: "we could not find it" is read as "the sample is fine", and "we found it" is read as "we got lucky". Neither statement holds.
1. First decide which kind of intermittent it is
The word is the same, the triggers are not, and neither is the way to reproduce them. Separate the classes first, or every later step is wasted.
| Trigger class | Typical symptom | What to pin down before reproducing |
|---|---|---|
| --- | --- | --- |
| Thermal | Occasional no-start when cold; parameter drift after heat soak; contact resistance rising hot and recovering cold | Whether the fault appears on the ramp up, on the plateau or on the ramp down; whether soak time was sufficient |
| Mechanical | Appears after kerbs, idle vibration, door slams, press-fitting or mating cycles; clears on power cycle | Mounting attitude and tightening torque; harness routing and tie points; axis of application |
| Electrical state | Only at a particular power-up sequence, load step, sleep-wake transition or frame offset | The supply ramp; the instant of load switching; communication state and monitoring point |
| Time and life | Appears after a period of running, clears on restart, normal again the next day | Accumulated run time; software counters and memory state; the full operating sequence before the event |
For the thermal class the decision point is usually written in the wrong place. The question is not "at how many degrees did it fail" but "at the moment it failed, which way was the temperature moving". Expansion mismatch on a ramp and thermal equilibrium on a plateau are two different stress states, and the same sample can behave in opposite ways in the two.
For the mechanical class the problem is usually not level but restraint. Change the tie spacing or the branch routing of one harness and the resonance moves; once it moves, the whole set of checks in reading a random vibration PSD has to move with it. Whether such a fault shows up on the bench depends on whether the restraint resembles the vehicle, not on how long you shake it.
The electrical class is the one most often skipped, because it needs no external stress at all - only a sequence. A faster supply ramp raises the inrush into capacitive loads and narrows the window of an undervoltage reset, and that fault is invisible under steady supply. How to separate the three reset paths is laid out in the ESD reset article: external reset pin, brown-out and watchdog each have their own evidence. An intermittent reset is usually the one of the three that sits closest to its boundary.
2. Why a single-stress bench cannot see it
Because a single-stress bench is built on the premise of moving one variable at a time. That premise is excellent for finding regularities and exactly backwards for chasing intermittent faults.
| Blind spot | Why it misses | What to change |
|---|---|---|
| --- | --- | --- |
| One variable at a time | A combined effect only appears when two stresses are present together; split them and you are running a different test | Use a condition matrix and stack two real variables into the same window |
| Stress and decision separated | The event happens during application; the power-on check afterwards is perfectly normal | Monitor while stressing; write the decision point into the outline |
| Monitoring too slow | A dropout or glitch lasts far less than a polling interval, so the trace is a flat line | Choose sampling capability against the event scale; use hardware latching where needed |
| Sample "cured" by handling | Re-mating, cleaning and re-crimping clear the contact problem and destroy the evidence with it | Do non-destructive forensics first, decide about disassembly later |
| Only the end points are run | The high-incidence zones are ramps, resonance crossings and supply rise, not steady states | Treat transition segments as their own observation window |
The third row deserves a note of its own. Intermittent events are short, while routine monitoring is polled: the host reads a value at intervals, so it records readings rather than the process. A dropout that falls between two polls shows up as "all normal". That is not a shortcoming of the instrument; it is a mismatch between the sampling capability of the monitored item and the time scale of the event. The sampling capability of an acceptance item is itself part of the test condition.
The fourth row is the most common self-inflicted wound. An engineer wants "one more look", opens the unit, re-seats the connector, re-crimps the terminal - and the fault is gone. The sample really is "fixed", but the interface that caused the problem has been destroyed, and every later analysis is guesswork. What to do first after a failure is set out in the order for preserving evidence; one sentence is enough here: at the moment reproduction succeeds, the sample is worth more than anything else in the room. Preserve first, touch later.
3. Four steps from "cannot find it" to "reproducible", in this order
Step one: build an event log. Time, temperature, operating state, symptom, whether it cleared on restart - one line each. The real value of the log is not recording when the fault happened, but letting you ask the opposite question: when does it not happen? Elimination is often faster than reproduction here. List the conditions of the windows where nothing happened, compare them with the windows where it did, and the missing factor usually surfaces.
Step two: build a condition matrix, not more severity. A matrix stacks the two variables that genuinely coincide on the vehicle into the same window - temperature with power-up sequence, temperature with vibration, vibration with load switching. Levels stay where the standard and the customer specification put them; the matrix changes exactly one thing, simultaneity. That is the difference between severity and a matrix: severity pushes one axis higher, a matrix makes two axes meet. It is also why a combined test finds what single-stress tests cannot, as explained in the article on simultaneous stresses.
Step three: monitor while stressing. Choose the monitored quantity by the rule "same physical quantity as the symptom": a dropout means supply and loop current continuity, a reset means reset flags and watchdog counts, a communication error means error counters and frame gaps. The monitoring point matters as much - the same reset looks different at the harness end and after the regulator.
Step four: lock the sample the moment it reproduces. Record attitude, tightening torque, harness routing, the number of attempts and the occurrence ratio, then stop. The reproduction rate is part of the conclusion: how many times out of ten decides whether this is a condition-sensitive fault or one on the edge of wear-out, and those two lead to completely different corrective actions.
4. Four columns in the outline, three traps
Four columns are worth writing into the technical agreement for this kind of commission.
| Column | What to write | Cost of leaving it out |
|---|---|---|
| --- | --- | --- |
| Trigger hypothesis | Which classes are suspected, how they are combined, on what evidence | The work degenerates into running standard levels and seeing what turns up |
| Monitoring and sampling | Which quantity, at which point, whether sampling resolves the event scale | The report says the function was normal, and nobody knows what happened during the test |
| Stress and dwell schedule | Combination order, whether transitions are observed separately, time per round | High-incidence transition zones are skipped and conclusions cover only the end points |
| Reproduction criterion | What counts as one occurrence, how many rounds, counted or as a ratio | "It reproduced" carries no information and cannot be compared with the next round |
Three traps, each more expensive than the last.
Trap one: writing "not reproducible" as a conclusion. A report can state that the phenomenon was not observed under the stated conditions. It cannot state that the sample does not have the fault. The first is an observation, the second a causal claim, and a causal claim needs a chain of evidence. The article on passing in the lab and failing on the vehicle draws the same line from the other side: the validity of a report always equals the conditions it actually states.
Trap two: substituting severity for combination. Severity only raises probability. When a mechanism needs two conditions to meet, pushing a single axis higher merely substitutes another failure mode and makes attribution harder. Almost all the cost of reproducing an intermittent fault is spent on finding which two conditions have to meet.
Trap three: disassembling first. Contact interfaces - terminals, crimps, solder joints - never return to their original state once opened. The two opposite directions of contact failure, welding from too much energy and no-contact from too little, are separated in detail in the relay article, and both share the same forensic precondition: look first, touch later.
The condition framework still comes from the two base documents, GB/T 28046 and the ISO 16750 series. They supply methods and level structures; they do not decide for you which two conditions should be present together - that column can only be inferred from vehicle operating conditions and the observed symptom. Application detail for vibration and mechanical work is under vibration and mechanical load testing and materials and mechanical testing; how to group environmental and electrical items into a programme follows a separate trimming logic in the environmental reliability checklist.
A few plain words
Reproducing an intermittent fault is a search over conditions, not an escalation of force. A search needs records, a matrix and monitoring; miss one and it becomes luck, and luck cannot be delivered.
When TMC LAB takes on such a commission, the trigger hypothesis and the monitoring items are agreed first, then the stress combination and the decision point are fixed. Conditions and limits follow the standard text, the customer specification and the technical agreement, with no values preset before the test. Non-destructive forensics is done the moment reproduction succeeds, and sample state, attempt count and occurrence ratio go into the record together.
Bringing the operating conditions at the time of failure, the frequency of occurrence and the directions already ruled out lets the condition matrix be shortened by a few rounds. Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.