Key takeaways
Contact welding and loss of contact are opposite failures: the first comes from inrush and breaking-arc energy, the second from films that accumulate because no arc cleans the surface. Current headroom fixes neither, because the rating only covers steady-state carrying. A bench outline must state load type and inrush, switching rhythm, environmental overlay, and monitoring method; miss one column and the result is not comparable.
The two classic ways an automotive relay contact fails run in exactly opposite directions: welding is too much energy, loss of contact is too little. A contact keeps a low-resistance joint partly because the arc at each operation burns the surface film away - with high current that same energy is enough to fuse two pieces of metal together, and with low current there is no arc at all, so the film only thickens. The same relay model welding shut in a lamp circuit while dropping out intermittently in a sensor circuit is therefore not a batch problem; it is being used at two opposite operating points. Current headroom, however generous, prevents neither.
1. First, decide which load class the contact sits in
A contact conducts reliably when two things hold at once: the interface is clean metal, and the contact force is sufficient.
Half of the first condition is maintained by the arc itself. The small arc at each operation burns off a layer of oxide or sulphide - self-cleaning by arc. The same contact set therefore diverges into two extremes depending on current.
| Load type | Current behaviour at switching | Dominant failure | What the bench must reproduce |
|---|---|---|---|
| --- | --- | --- | --- |
| Lamp filament, PTC heater | Low cold resistance, pronounced inrush on make | Welding, material transfer | Inrush magnitude and switching phase |
| Motor, solenoid, relay coil | Inductive back-EMF on break, long arc tail | Welding, erosion | Break energy, and whether suppression is present |
| Capacitive load, heavily filtered stage | Near short circuit on make | Welding | Pre-charge state and number of makes |
| Dry-contact signal, sensor loop | Microamps to milliamps, no arc | Film-driven loss of contact | Switchability at low level |
Decide which row applies before discussing test conditions. Skip this step and every condition afterwards is a guess.
2. Welding: three energy sources, and suppression placed in the wrong spot
Welding is not one vague event called "burnt contact". It has two distinct moments, handled differently.
At make. The contacts bounce - repeatedly closing and opening for tens of microseconds to a few milliseconds - while inrush current is near its peak. Bounce turns one make into a dozen micro-arcs, each carrying inrush. That is the high-probability window for welding.
At break. Current through an inductive load cannot change instantly, so an arc forms across the gap, lasting as long as the load inductance and circuit stray parameters allow. The arc melts the contact locally, and it fuses as it cools.
| Energy source | Field evidence | Direction of correction |
|---|---|---|
| --- | --- | --- |
| Inrush at make | Weld zone in the middle of the contact face, spread out, no deep crater | Limit inrush (pre-heat, current limiting, NTC), or specify a contact rated for inrush |
| Break arc and bounce | One crater and one built-up peak, unidirectional material transfer | Arc suppression, installed in the right place |
| Load abnormality (stall, short) | Large weld area, discoloured housing or base | Separate fault current from undersized selection first |
One point is regularly confused: a flyback diode across the coil suppresses coil back-EMF and does nothing about the arc in the contact circuit.
These are two independent loops. A diode across the coil protects the driving transistor; it has no effect on the arc drawn when the contact opens the load. To reduce contact arcing, suppression must sit on the load the contact is switching - and the side effects matter: an RC network across the contacts passes leakage current, so the load may stay faintly lit or slightly energised after opening, which is easily misread as incomplete opening.
There is also a DC-specific effect: material transfer is unidirectional, leaving a crater on the anode and a spike on the cathode. The same relay with reversed load polarity shows a visibly different life result. When a unit fails after "only the wiring was changed", check polarity before suspecting the batch.
3. Loss of contact: three film sources and the trap of a healthy reading
In low-level circuits there is no arc, so once a film forms nothing removes it.
| Source | Atmosphere or condition | Film tendency | How to distinguish |
|---|---|---|---|
| --- | --- | --- | --- |
| Sulphur-bearing atmosphere | Rubber vulcanising agents, sealants, packaging | Silver sulphide, contact resistance creeping up | Cross-section plus elemental analysis |
| Oxidation | High-temperature storage, long-term low current | Thin, dense oxide film | Dry-circuit result versus after load switching |
| Organic contamination | Flux, release agents, outgassing adhesives | Organic film, often with unstable contact | Re-measure before and after solvent cleaning |
The key sentence: a normal contact resistance reading does not mean the signal circuit will conduct.
The test current used for the reading can itself break down a film tens of nanometres to a few micrometres thick, so the number looks healthy; the operating current in a signal circuit is far smaller and cannot break the same film. This is the usual explanation for "it measured fine on the bench and drops out in the vehicle".
Three steps resolve it.
Measure continuity on a dry circuit - low voltage, low current, no breakdown energy - and a film present will read as an open.
Re-measure after switching the actual load. If conduction returns after arcing, the film explanation is confirmed.
Then cross-section the contact and run elemental analysis to establish sulphide, oxide or organic contamination. That step decides the correction: change the contact material, control the atmosphere, or change the cleaning process. The three routes are not interchangeable.
One boundary worth drawing: contact film is an interface problem, showing up in contact resistance and signal continuity; electrochemical migration is an insulation path problem, showing up in insulation resistance. Both may be written up as "poor contact", yet the corrections are nearly opposite - the electrochemical migration article covers the water film, ionic species and bias triad, while this one covers atmosphere and switching current. Do not merge them into a single conclusion.
4. Reproducing it on the bench: four columns in the outline
Translating a vehicle-level failure into bench conditions takes four columns.
| Column | What must be stated | Consequence if wrong |
|---|---|---|
| --- | --- | --- |
| Load and time constant | Load type, steady current, inrush multiple, L/R or power factor | Tested against the rating only; inrush never reached the sample |
| Switching rhythm | On and off durations, duty cycle, frequency, whether switching is on-load | Welding probability tracks the rhythm, so results from different rhythms are not comparable |
| Environmental overlay | Temperature, humidity, sulphur-bearing atmosphere, vibration | Film failures simply do not appear in a clean chamber at room temperature |
| Monitoring method | On-line contact resistance, weld detection, operate time and bounce | "It still operates afterwards" misses degradation and intermittent opens |
Of the four, monitoring is skipped most often and changes the conclusion most.
Weld detection has to be on-line: measure the voltage across the contacts in the open state - close to supply voltage means genuinely open, clearly lower means still conducting. A sample that welded once and released will pass a post-test "does it still operate" check.
Record bounce time and operate time for every operation. Lengthening bounce is often an earlier sign of surface degradation than contact resistance.
When vibration is overlaid, separate intermittent opens from welding: an intermittent open is insufficient contact force, welding is fusion, and the corrections differ - one adds force, the other removes energy. The harness side of vibration is covered in the harness vibration article; this article stays with the contact body.
A few plain words
- Welding and loss of contact are opposite chains; a rated-load life result explains neither;
- The current rating is a steady-state figure - inrush and arc energy cause welding, and a larger relay does not help;
- A coil flyback diode protects the driver, not the contact arc; suppression belongs on the load side;
- A normal contact resistance reading is not a conclusion; without a dry-circuit re-measure it is not a measurement;
- Bounce time is an early indicator of contact degradation, more sensitive than a post-mortem look.
When TMC LAB takes on relay and switch work, the load type and inrush, the switching rhythm, the environmental overlay and the monitoring method are written into the outline first, and only then is the choice made between a life test and a low-level switchability test. Failed parts go through an unopened electrical re-measurement and evidence capture before any cross-section and elemental analysis. As a vehicle electrical component, a relay is also assessed on the environmental and electrical load skeleton of GB/T 28046 and ISO 16750, while conducted emission from coil switching is a separate item under CISPR 25; load-side transients such as load dump 5a/5b are a different test and cannot substitute. Specific conditions, load classes and criteria follow the customer's controlled standard version, the customer specification and the technical agreement.
For contact structure and terminal-side issues, see connector reliability testing and mechanical durability; coil switching interference is handled through the EMC service page; evidence handling for failed samples is set out in how a failure during test is reported; the vibration overlay is scheduled through vibration testing.
Scheduling is arranged per project; you can state your expected delivery date when submitting samples, and we will confirm a feasible plan against the current schedule and report progress at each milestone.



